Cargando…
Commissioning the ELENA Beam Diagnostics Systems at CERN
The Extra Low ENergy Antiproton ring (ELENA) at CERN entered the commissioning phase in November 2016 using H⁻ ions and antiprotons to setup the machine at the different energy plateaus. The low intensities and energy of the ELENA beam generate very weak signals making beam diagnostics very challeng...
Autores principales: | Tranquille, Gerard, Burger, Stephane, Gąsior, Marek, Grandemange, Pierre, Levens, Thomas, Marqversen, Ole, Søby, Lars |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPAF084 http://cds.cern.ch/record/2649946 |
Ejemplares similares
-
ELENA Commissioning and Status
por: Carli, Christian, et al.
Publicado: (2021) -
CERN Antiproton Decelerator Beam Instrumentation for the ELENA era
por: Ludwig, M, et al.
Publicado: (2014) -
ELENA Commissioning
por: Gamba, Davide, et al.
Publicado: (2019) -
ELENA Commissioning
por: Gamba, Davide, et al.
Publicado: (2020) -
The ELENA Beam Diagnostics Systems
por: Tranquille, G
Publicado: (2013)