Cargando…
Validation of the CERN PS Eddy Current Injection Septa
As part of the upgrade of the CERN PS accelerator from 1.4 GeV to 2 GeV, new injection septa have been developed. The system is comprised of a pulsed eddy current septum magnet and a pulsed eddy current bumper magnet. Both magnets will be housed in a common vacuum vessel and powered by independent p...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF037 http://cds.cern.ch/record/2666853 |