Cargando…
CERN PS Kicker for Proton Injection: from Beam-Based Waveform Measurements to Hardware Improvements
For 2017 operation, the termination mode of the CERN Proton Synchrotron (PS) horizontal injection kicker was permanently changed to short-circuited, to be compliant with the future performances requested by the LHC Injectors Upgrade (LIU) project. An extensive campaign of measurements was performed...
Autores principales: | Forte, Vincenzo, Ferrero Colomo, Alvaro, Fraser, Matthew, Kramer, Thomas |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF027 http://cds.cern.ch/record/2664978 |
Ejemplares similares
-
Beam-Based Waveform Measurements of the CERN PS Injection Kicker
por: Forte, Vincenzo, et al.
Publicado: (2017) -
Magnetic Waveform Measurements of the PS Injection Kicker KFA45 and Future Emittance Growth Estimates
por: Forte, Vincenzo, et al.
Publicado: (2018) -
Performance validation of the existing and upgraded PS injection kicker
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2019) -
Performance Measurements and Analysis of Jitter Like Events for the PS Injection Kicker System
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2018) -
Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
por: Kramer, Thomas, et al.
Publicado: (2021)