Cargando…

CERN PS Kicker for Proton Injection: from Beam-Based Waveform Measurements to Hardware Improvements

For 2017 operation, the termination mode of the CERN Proton Synchrotron (PS) horizontal injection kicker was permanently changed to short-circuited, to be compliant with the future performances requested by the LHC Injectors Upgrade (LIU) project. An extensive campaign of measurements was performed...

Descripción completa

Detalles Bibliográficos
Autores principales: Forte, Vincenzo, Ferrero Colomo, Alvaro, Fraser, Matthew, Kramer, Thomas
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF027
http://cds.cern.ch/record/2664978

Ejemplares similares