Cargando…

Commissioning of ROD boards for the entire ATLAS Pixel Detector

The ATLAS Experiment has reworked and upgraded some electronic DAQ chains during the 2013–2015 LHC shut down and an additional barrel layer has been inserted as part of the Pixel Detector: the Insertable B-Layer (IBL). The Layers 2 and 1 of the ATLAS Pixel Detector have also been upgraded, using the...

Descripción completa

Detalles Bibliográficos
Autor principal: Gabrielli, A
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/13/09/T09009
http://cds.cern.ch/record/2647251

Ejemplares similares