Cargando…

Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator

Within the U.S. magnet development program, Fermilab is developing a 15-T Nb$_3$Sn dipole demonstrator. Prior to the construction of the real magnet model, short sections and the whole structure were instrumented with strain gauges and assembled to validate the results of structural analysis, check...

Descripción completa

Detalles Bibliográficos
Autores principales: Orozco, Charles, Carmichael, Justin, Novitski, Igor, Stoynev, Stoyan, Zlobin, Alexander V
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2019.2903812
http://cds.cern.ch/record/2773941
_version_ 1780971629099089920
author Orozco, Charles
Carmichael, Justin
Novitski, Igor
Stoynev, Stoyan
Zlobin, Alexander V
author_facet Orozco, Charles
Carmichael, Justin
Novitski, Igor
Stoynev, Stoyan
Zlobin, Alexander V
author_sort Orozco, Charles
collection CERN
description Within the U.S. magnet development program, Fermilab is developing a 15-T Nb$_3$Sn dipole demonstrator. Prior to the construction of the real magnet model, short sections and the whole structure were instrumented with strain gauges and assembled to validate the results of structural analysis, check tooling, and to gain experience with the assembly of the real magnet components. This paper summarizes the lessons learned from these mechanical models and compares the measured data with the finite-element analysis.
id oai-inspirehep.net-1712349
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17123492022-11-17T14:39:47Zdoi:10.1109/TASC.2019.2903812http://cds.cern.ch/record/2773941engOrozco, CharlesCarmichael, JustinNovitski, IgorStoynev, StoyanZlobin, Alexander VAssembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole DemonstratorAccelerators and Storage RingsWithin the U.S. magnet development program, Fermilab is developing a 15-T Nb$_3$Sn dipole demonstrator. Prior to the construction of the real magnet model, short sections and the whole structure were instrumented with strain gauges and assembled to validate the results of structural analysis, check tooling, and to gain experience with the assembly of the real magnet components. This paper summarizes the lessons learned from these mechanical models and compares the measured data with the finite-element analysis.FERMILAB-CONF-18-579-TDoai:inspirehep.net:17123492019
spellingShingle Accelerators and Storage Rings
Orozco, Charles
Carmichael, Justin
Novitski, Igor
Stoynev, Stoyan
Zlobin, Alexander V
Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title_full Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title_fullStr Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title_full_unstemmed Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title_short Assembly and Tests of Mechanical Models of the 15-T Nb$_3$Sn Dipole Demonstrator
title_sort assembly and tests of mechanical models of the 15-t nb$_3$sn dipole demonstrator
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/TASC.2019.2903812
http://cds.cern.ch/record/2773941
work_keys_str_mv AT orozcocharles assemblyandtestsofmechanicalmodelsofthe15tnb3sndipoledemonstrator
AT carmichaeljustin assemblyandtestsofmechanicalmodelsofthe15tnb3sndipoledemonstrator
AT novitskiigor assemblyandtestsofmechanicalmodelsofthe15tnb3sndipoledemonstrator
AT stoynevstoyan assemblyandtestsofmechanicalmodelsofthe15tnb3sndipoledemonstrator
AT zlobinalexanderv assemblyandtestsofmechanicalmodelsofthe15tnb3sndipoledemonstrator