The SCintillator-ECAL Beam Test at DESY, 2007 - Update 1
A beam test of the SCECAL prototype module was performed in the period Feb 26 - Mar 28 2007 using 1-6 GeV positron beams at the DESY-II electron synchrotron. This is an update of a previous note [1], presenting the results of further analysis of the collected data, mainly the results of position sca...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2669477 |
Sumario: | A beam test of the SCECAL prototype module was performed in the
period Feb 26 - Mar 28 2007 using 1-6 GeV positron beams at the DESY-II
electron synchrotron.
This is an update of a previous note [1], presenting the results of further analysis of the collected data, mainly the results of position scans
with MIP and EM shower events and a comparison of the three detector
configurations.
The results presented in this note will be shown at the 2007 ALPCG
meeting at FNAL. |
---|