Cargando…
LINAC4 Commissioning
This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Lina...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-LINAC2018-TH1P01 http://cds.cern.ch/record/2669232 |
Sumario: | This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Linac2. |
---|