LINAC4 Commissioning
This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Lina...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-LINAC2018-TH1P01 http://cds.cern.ch/record/2669232 |
_version_ | 1780962234060505088 |
---|---|
author | Lombardi, Alessandra |
author_facet | Lombardi, Alessandra |
author_sort | Lombardi, Alessandra |
collection | CERN |
description | This talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Linac2. |
id | oai-inspirehep.net-1717132 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-17171322019-09-30T06:29:59Zdoi:10.18429/JACoW-LINAC2018-TH1P01http://cds.cern.ch/record/2669232engLombardi, AlessandraLINAC4 CommissioningAccelerators and Storage RingsThis talk reviews the commissioning effort of CERN's new H⁻ linear accelerator, Linac4, which is presently undergoing a beam quality and reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the 50MeV proton Linac2.This paper reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the ageing Linac2.CERN-ACC-2018-196oai:inspirehep.net:17171322018 |
spellingShingle | Accelerators and Storage Rings Lombardi, Alessandra LINAC4 Commissioning |
title | LINAC4 Commissioning |
title_full | LINAC4 Commissioning |
title_fullStr | LINAC4 Commissioning |
title_full_unstemmed | LINAC4 Commissioning |
title_short | LINAC4 Commissioning |
title_sort | linac4 commissioning |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-LINAC2018-TH1P01 http://cds.cern.ch/record/2669232 |
work_keys_str_mv | AT lombardialessandra linac4commissioning |