Cargando…

Status and Experience with the Alignment of LINAC4

LINAC4 (L4) is an H-linear accelerator that will deliver, for the High Luminosity LHC (HL-LHC) project requirements, a beam of protons at 160 MeV energy to the PS complex and then to the LHC. Its connection to the PS booster will take place during the Long Shutdown 2 (LS2) in 2019-2020 or earlier if...

Descripción completa

Detalles Bibliográficos
Autor principal: Fuchs, Jean-Frederic
Lenguaje:eng
Publicado: 2016
Materias:
Acceso en línea:http://cds.cern.ch/record/2680825
_version_ 1780963013026643968
author Fuchs, Jean-Frederic
author_facet Fuchs, Jean-Frederic
author_sort Fuchs, Jean-Frederic
collection CERN
description LINAC4 (L4) is an H-linear accelerator that will deliver, for the High Luminosity LHC (HL-LHC) project requirements, a beam of protons at 160 MeV energy to the PS complex and then to the LHC. Its connection to the PS booster will take place during the Long Shutdown 2 (LS2) in 2019-2020 or earlier if any major failure of the LINAC2. The Linac4 project requires the precise alignment with a tolerance of about +/-0.2 mm in both the horizontal and vertical planes, ofelements along approximately 150m beam line.This paper will give a status, an overview of the challenges of the alignment, the issues solved by the survey section, the techniques and methodology used to realise the survey activities over the last five years.
id oai-inspirehep.net-1722411
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2016
record_format invenio
spelling oai-inspirehep.net-17224112019-09-30T06:29:59Zhttp://cds.cern.ch/record/2680825engFuchs, Jean-FredericStatus and Experience with the Alignment of LINAC4Accelerators and Storage RingsLINAC4 (L4) is an H-linear accelerator that will deliver, for the High Luminosity LHC (HL-LHC) project requirements, a beam of protons at 160 MeV energy to the PS complex and then to the LHC. Its connection to the PS booster will take place during the Long Shutdown 2 (LS2) in 2019-2020 or earlier if any major failure of the LINAC2. The Linac4 project requires the precise alignment with a tolerance of about +/-0.2 mm in both the horizontal and vertical planes, ofelements along approximately 150m beam line.This paper will give a status, an overview of the challenges of the alignment, the issues solved by the survey section, the techniques and methodology used to realise the survey activities over the last five years.oai:inspirehep.net:17224112016
spellingShingle Accelerators and Storage Rings
Fuchs, Jean-Frederic
Status and Experience with the Alignment of LINAC4
title Status and Experience with the Alignment of LINAC4
title_full Status and Experience with the Alignment of LINAC4
title_fullStr Status and Experience with the Alignment of LINAC4
title_full_unstemmed Status and Experience with the Alignment of LINAC4
title_short Status and Experience with the Alignment of LINAC4
title_sort status and experience with the alignment of linac4
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2680825
work_keys_str_mv AT fuchsjeanfrederic statusandexperiencewiththealignmentoflinac4