First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
As part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
IOP
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/502/1/012126 http://cds.cern.ch/record/2714438 |
_version_ | 1780965492062683136 |
---|---|
author | Benda, V Lees, A Pirotte, O Craen, A Vande Pezzetti, M Lamboy, J P Lefebvre, V Bajko, M Giloux, C |
author_facet | Benda, V Lees, A Pirotte, O Craen, A Vande Pezzetti, M Lamboy, J P Lefebvre, V Bajko, M Giloux, C |
author_sort | Benda, V |
collection | CERN |
description | As part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is comprised of five vertical test cryostats of various sizes operating at either 1.9 K or 4.2 K. It is now possible to test a wide range of superconducting high field magnets with weigh up to 18 tons, maximum stored energy of 10 MJ and powering requirements up to 30 kA. This article describes the first cryogenic operational experiences with these test stations, their cool-down and warm-up characteristics and the heat in-leak measurements of their components. Major upgrades made to the cryogenic infrastructure of the vertical magnet test facility as a whole are also detailed. This includes the adoption of an improved safety strategy to ensure the continued safe operation of the test facility during all operational modes. As well as the incorporation of quench recovery systems on four of the five test stations to reduce the amount of helium lost during testing and the installation helium guards on infrastructure operating at 1.9 K to avoid the ingress of air to cryogenic circuits. |
id | oai-inspirehep.net-1731737 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
publisher | IOP |
record_format | invenio |
spelling | oai-inspirehep.net-17317372022-08-17T12:59:50Zdoi:10.1088/1757-899X/502/1/012126http://cds.cern.ch/record/2714438engBenda, VLees, APirotte, OCraen, A VandePezzetti, MLamboy, J PLefebvre, VBajko, MGiloux, CFirst operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.Accelerators and Storage RingsAs part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is comprised of five vertical test cryostats of various sizes operating at either 1.9 K or 4.2 K. It is now possible to test a wide range of superconducting high field magnets with weigh up to 18 tons, maximum stored energy of 10 MJ and powering requirements up to 30 kA. This article describes the first cryogenic operational experiences with these test stations, their cool-down and warm-up characteristics and the heat in-leak measurements of their components. Major upgrades made to the cryogenic infrastructure of the vertical magnet test facility as a whole are also detailed. This includes the adoption of an improved safety strategy to ensure the continued safe operation of the test facility during all operational modes. As well as the incorporation of quench recovery systems on four of the five test stations to reduce the amount of helium lost during testing and the installation helium guards on infrastructure operating at 1.9 K to avoid the ingress of air to cryogenic circuits.IOPoai:inspirehep.net:17317372019 |
spellingShingle | Accelerators and Storage Rings Benda, V Lees, A Pirotte, O Craen, A Vande Pezzetti, M Lamboy, J P Lefebvre, V Bajko, M Giloux, C First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title | First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title_full | First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title_fullStr | First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title_full_unstemmed | First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title_short | First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations. |
title_sort | first operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the sm18 hall, including hfm and cluster d test stations. |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1088/1757-899X/502/1/012126 http://cds.cern.ch/record/2714438 |
work_keys_str_mv | AT bendav firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT leesa firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT pirotteo firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT craenavande firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT pezzettim firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT lamboyjp firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT lefebvrev firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT bajkom firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations AT gilouxc firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations |