First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.

As part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is...

Descripción completa

Detalles Bibliográficos
Autores principales: Benda, V, Lees, A, Pirotte, O, Craen, A Vande, Pezzetti, M, Lamboy, J P, Lefebvre, V, Bajko, M, Giloux, C
Lenguaje:eng
Publicado: IOP 2019
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1757-899X/502/1/012126
http://cds.cern.ch/record/2714438
_version_ 1780965492062683136
author Benda, V
Lees, A
Pirotte, O
Craen, A Vande
Pezzetti, M
Lamboy, J P
Lefebvre, V
Bajko, M
Giloux, C
author_facet Benda, V
Lees, A
Pirotte, O
Craen, A Vande
Pezzetti, M
Lamboy, J P
Lefebvre, V
Bajko, M
Giloux, C
author_sort Benda, V
collection CERN
description As part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is comprised of five vertical test cryostats of various sizes operating at either 1.9 K or 4.2 K. It is now possible to test a wide range of superconducting high field magnets with weigh up to 18 tons, maximum stored energy of 10 MJ and powering requirements up to 30 kA. This article describes the first cryogenic operational experiences with these test stations, their cool-down and warm-up characteristics and the heat in-leak measurements of their components. Major upgrades made to the cryogenic infrastructure of the vertical magnet test facility as a whole are also detailed. This includes the adoption of an improved safety strategy to ensure the continued safe operation of the test facility during all operational modes. As well as the incorporation of quench recovery systems on four of the five test stations to reduce the amount of helium lost during testing and the installation helium guards on infrastructure operating at 1.9 K to avoid the ingress of air to cryogenic circuits.
id oai-inspirehep.net-1731737
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
publisher IOP
record_format invenio
spelling oai-inspirehep.net-17317372022-08-17T12:59:50Zdoi:10.1088/1757-899X/502/1/012126http://cds.cern.ch/record/2714438engBenda, VLees, APirotte, OCraen, A VandePezzetti, MLamboy, J PLefebvre, VBajko, MGiloux, CFirst operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.Accelerators and Storage RingsAs part of the R&D; program for HL-LHC, the future upgrade of the Large Hadron Collider (LHC), the vertical magnet test facility in the SM18 cryogenic test hall at CERN has seen significant development. Since the installation of HFM and Cluster D cryogenic test stations in 2017, the facility is comprised of five vertical test cryostats of various sizes operating at either 1.9 K or 4.2 K. It is now possible to test a wide range of superconducting high field magnets with weigh up to 18 tons, maximum stored energy of 10 MJ and powering requirements up to 30 kA. This article describes the first cryogenic operational experiences with these test stations, their cool-down and warm-up characteristics and the heat in-leak measurements of their components. Major upgrades made to the cryogenic infrastructure of the vertical magnet test facility as a whole are also detailed. This includes the adoption of an improved safety strategy to ensure the continued safe operation of the test facility during all operational modes. As well as the incorporation of quench recovery systems on four of the five test stations to reduce the amount of helium lost during testing and the installation helium guards on infrastructure operating at 1.9 K to avoid the ingress of air to cryogenic circuits.IOPoai:inspirehep.net:17317372019
spellingShingle Accelerators and Storage Rings
Benda, V
Lees, A
Pirotte, O
Craen, A Vande
Pezzetti, M
Lamboy, J P
Lefebvre, V
Bajko, M
Giloux, C
First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title_full First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title_fullStr First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title_full_unstemmed First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title_short First operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the SM18 hall, including HFM and cluster D test stations.
title_sort first operational experience of the upgraded cryogenic infrastructure of the vertical magnet test facility in the sm18 hall, including hfm and cluster d test stations.
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1088/1757-899X/502/1/012126
http://cds.cern.ch/record/2714438
work_keys_str_mv AT bendav firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT leesa firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT pirotteo firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT craenavande firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT pezzettim firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT lamboyjp firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT lefebvrev firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT bajkom firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations
AT gilouxc firstoperationalexperienceoftheupgradedcryogenicinfrastructureoftheverticalmagnettestfacilityinthesm18hallincludinghfmandclusterdteststations