The Installation and Commissioning of the AWAKE Stripline BPM
AWAKE (The Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN) stripline BPMs are required to measure the position of the single electron bunch to a position resolution of less than 10 µm rms for electron charge of 100 pC to 1 nC. This paper describes the design, installation an...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2018-TUPB01 http://cds.cern.ch/record/2716026 |
_version_ | 1780965495993794560 |
---|---|
author | Liu, Shengli Dirksen, Paul Gessner, Spencer Guillot-Vignot, Franck Medina, David Søby, Lars Verzilov, Victor |
author_facet | Liu, Shengli Dirksen, Paul Gessner, Spencer Guillot-Vignot, Franck Medina, David Søby, Lars Verzilov, Victor |
author_sort | Liu, Shengli |
collection | CERN |
description | AWAKE (The Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN) stripline BPMs are required to measure the position of the single electron bunch to a position resolution of less than 10 µm rms for electron charge of 100 pC to 1 nC. This paper describes the design, installation and commissioning of a such BPM system developed by TRIUMF (Canada). Total 12 BPMs and electronics had been installed on AWAKE beam lines and started commissioning since Fall of 2017. The calibration and measurement performance are also reviewed. |
id | oai-inspirehep.net-1736103 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
publisher | JACoW |
record_format | invenio |
spelling | oai-inspirehep.net-17361032020-05-03T21:20:54Zdoi:10.18429/JACoW-IBIC2018-TUPB01http://cds.cern.ch/record/2716026engLiu, ShengliDirksen, PaulGessner, SpencerGuillot-Vignot, FranckMedina, DavidSøby, LarsVerzilov, VictorThe Installation and Commissioning of the AWAKE Stripline BPMAccelerators and Storage RingsDetectors and Experimental TechniquesAWAKE (The Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN) stripline BPMs are required to measure the position of the single electron bunch to a position resolution of less than 10 µm rms for electron charge of 100 pC to 1 nC. This paper describes the design, installation and commissioning of a such BPM system developed by TRIUMF (Canada). Total 12 BPMs and electronics had been installed on AWAKE beam lines and started commissioning since Fall of 2017. The calibration and measurement performance are also reviewed.JACoWoai:inspirehep.net:17361032019 |
spellingShingle | Accelerators and Storage Rings Detectors and Experimental Techniques Liu, Shengli Dirksen, Paul Gessner, Spencer Guillot-Vignot, Franck Medina, David Søby, Lars Verzilov, Victor The Installation and Commissioning of the AWAKE Stripline BPM |
title | The Installation and Commissioning of the AWAKE Stripline BPM |
title_full | The Installation and Commissioning of the AWAKE Stripline BPM |
title_fullStr | The Installation and Commissioning of the AWAKE Stripline BPM |
title_full_unstemmed | The Installation and Commissioning of the AWAKE Stripline BPM |
title_short | The Installation and Commissioning of the AWAKE Stripline BPM |
title_sort | installation and commissioning of the awake stripline bpm |
topic | Accelerators and Storage Rings Detectors and Experimental Techniques |
url | https://dx.doi.org/10.18429/JACoW-IBIC2018-TUPB01 http://cds.cern.ch/record/2716026 |
work_keys_str_mv | AT liushengli theinstallationandcommissioningoftheawakestriplinebpm AT dirksenpaul theinstallationandcommissioningoftheawakestriplinebpm AT gessnerspencer theinstallationandcommissioningoftheawakestriplinebpm AT guillotvignotfranck theinstallationandcommissioningoftheawakestriplinebpm AT medinadavid theinstallationandcommissioningoftheawakestriplinebpm AT søbylars theinstallationandcommissioningoftheawakestriplinebpm AT verzilovvictor theinstallationandcommissioningoftheawakestriplinebpm AT liushengli installationandcommissioningoftheawakestriplinebpm AT dirksenpaul installationandcommissioningoftheawakestriplinebpm AT gessnerspencer installationandcommissioningoftheawakestriplinebpm AT guillotvignotfranck installationandcommissioningoftheawakestriplinebpm AT medinadavid installationandcommissioningoftheawakestriplinebpm AT søbylars installationandcommissioningoftheawakestriplinebpm AT verzilovvictor installationandcommissioningoftheawakestriplinebpm |