Cargando…

Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement

Coherent beam-beam instability in head-tail mode has been predicted in collision with a large crossing angle. The instability is serious for design of future e⁺e⁻ colliders based on the large crossing angle collision. It is possible to observe the instability in SuperKEKB commissioning. Horizontal b...

Descripción completa

Detalles Bibliográficos
Autores principales: Ohmi, Kazuhito, El Khechen, Dima, Hirosawa, Kouki, Koiso, Haruyo, Ohnishi, Yukiyoshi
Lenguaje:eng
Publicado: JACOW 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-eeFACT2018-TUYBA01
http://cds.cern.ch/record/2713400
_version_ 1780965382239027200
author Ohmi, Kazuhito
El Khechen, Dima
Hirosawa, Kouki
Koiso, Haruyo
Ohnishi, Yukiyoshi
author_facet Ohmi, Kazuhito
El Khechen, Dima
Hirosawa, Kouki
Koiso, Haruyo
Ohnishi, Yukiyoshi
author_sort Ohmi, Kazuhito
collection CERN
description Coherent beam-beam instability in head-tail mode has been predicted in collision with a large crossing angle. The instability is serious for design of future e⁺e⁻ colliders based on the large crossing angle collision. It is possible to observe the instability in SuperKEKB commissioning. Horizontal beam size blow-up of both beams has been seen depending on the tune operating point. We report the measurement results of the instability in SuperKEKB phase II commissioning.
id oai-inspirehep.net-1736330
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
publisher JACOW
record_format invenio
spelling oai-inspirehep.net-17363302020-07-16T16:01:06Zdoi:10.18429/JACoW-eeFACT2018-TUYBA01http://cds.cern.ch/record/2713400engOhmi, KazuhitoEl Khechen, DimaHirosawa, KoukiKoiso, HaruyoOhnishi, YukiyoshiBenchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB MeasurementAccelerators and Storage RingsCoherent beam-beam instability in head-tail mode has been predicted in collision with a large crossing angle. The instability is serious for design of future e⁺e⁻ colliders based on the large crossing angle collision. It is possible to observe the instability in SuperKEKB commissioning. Horizontal beam size blow-up of both beams has been seen depending on the tune operating point. We report the measurement results of the instability in SuperKEKB phase II commissioning.JACOWoai:inspirehep.net:17363302019
spellingShingle Accelerators and Storage Rings
Ohmi, Kazuhito
El Khechen, Dima
Hirosawa, Kouki
Koiso, Haruyo
Ohnishi, Yukiyoshi
Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title_full Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title_fullStr Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title_full_unstemmed Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title_short Benchmarking of Simulations of Coherent Beam-beam Instability with SuperKERKB Measurement
title_sort benchmarking of simulations of coherent beam-beam instability with superkerkb measurement
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-eeFACT2018-TUYBA01
http://cds.cern.ch/record/2713400
work_keys_str_mv AT ohmikazuhito benchmarkingofsimulationsofcoherentbeambeaminstabilitywithsuperkerkbmeasurement
AT elkhechendima benchmarkingofsimulationsofcoherentbeambeaminstabilitywithsuperkerkbmeasurement
AT hirosawakouki benchmarkingofsimulationsofcoherentbeambeaminstabilitywithsuperkerkbmeasurement
AT koisoharuyo benchmarkingofsimulationsofcoherentbeambeaminstabilitywithsuperkerkbmeasurement
AT ohnishiyukiyoshi benchmarkingofsimulationsofcoherentbeambeaminstabilitywithsuperkerkbmeasurement