Cargando…
Events reconstruction at 30 MHz for the LHCb upgrade
The Large Hadron Collider (LHC) Run 2 data taking period is coming to its end this year (2018). With the upcoming Long Shutdown 2 that will last till the end of 2020 we enter the upgrade era for the LHC based experiments. The LHCb experiment is going for a major upgrade (called LHCb Upgrade I) that...
Autor principal: | Szumlak, T |
---|---|
Lenguaje: | eng |
Publicado: |
Elsevier
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2018.12.044 http://cds.cern.ch/record/2717807 |
Ejemplares similares
-
Reconstruction at 30 MHz for the LHCb upgrade
por: Szumlak, Tomasz
Publicado: (2018) -
Reconstruction at 30 MHz for the LHCb upgrade
por: Santana Rangel, Murilo
Publicado: (2019) -
The 40 MHz trigger-less DAQ for the LHCb Upgrade
por: Campora Perez, D H, et al.
Publicado: (2016) -
The 40 MHz trigger-less DAQ for the LHCb upgrade
por: Falabella, A, et al.
Publicado: (2017) -
A 30 MHz software trigger and reconstruction for the LHCb upgrade
por: Henry, Louis
Publicado: (2020)