Cargando…
Design and construction of integrated small-diameter drift tube and thin-gap resistive plate chambers for the phase-1 upgrade of the ATLAS muon spectrometer
In the long shutdown for the Phase-1 upgrade of the Large Hadron Collider (LHC) in 2019–2020, 16 new integrated muon tracking and trigger chambers will be installed at the ends of the toroid magnet coils in the small azimuthal sectors of the inner barrel layer (BIS) of the ATLAS muon spectrometer in...
Autor principal: | Kroha, H |
---|---|
Lenguaje: | eng |
Publicado: |
elsevier
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2018.10.139 http://cds.cern.ch/record/2717575 |
Ejemplares similares
-
Design and Construction of Integrated Small-Diameter Drift Tube and Thin-Gap Resistive Plate Chambers for the Phase-1 Upgrade of the ATLAS Muon Spectrometer
por: Kroha, Hubert
Publicado: (2018) -
Phase I and II Upgrades of the ATLAS Muon Spectrometer with Integrated Small Diameter Drift Tube Chambers and Thin-Gap Resistive Plate Chambers
por: Walbrecht, Verena Maria
Publicado: (2018) -
Upgrades of the ATLAS muon spectrometer with new small-diameter drift tube chambers
por: El Moussaouy, Ali
Publicado: (2021) -
Design, Construction and Test of Small-Diameter Muon Drift Tube Chambers (sMDT) for the Phase-1 Upgrade of the ATLAS Muon Spectrometer
por: Rieck, Patrick, et al.
Publicado: (2019) -
Construction and Test of New Precision Drift-Tube Chambers for Upgrades of the ATLAS Muon Spectrometer in 2016/17
por: Kroha, H., et al.
Publicado: (2015)