Impedance reduction in the CERN SPS through element layout optimisation
The CERN accelerator complex is currently in its long shutdown while the LHC Injector Upgrade is being carried out. The upgrade includes, but is not limited to, the relocation of the beam dumping system; upgrade of the RF system; replacement of the electrostatic septa and impedance reduction. These...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPGW077 http://cds.cern.ch/record/2696274 |