Cargando…

Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3

In the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20,...

Descripción completa

Detalles Bibliográficos
Autores principales: Mereghetti, Alessio, Bruce, Roderik, Fuster-Martínez, Nuria, Mirarchi, Daniele, Redaelli, Stefano
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPRB051
http://cds.cern.ch/record/2695246
_version_ 1780964134931660800
author Mereghetti, Alessio
Bruce, Roderik
Fuster-Martínez, Nuria
Mirarchi, Daniele
Redaelli, Stefano
author_facet Mereghetti, Alessio
Bruce, Roderik
Fuster-Martínez, Nuria
Mirarchi, Daniele
Redaelli, Stefano
author_sort Mereghetti, Alessio
collection CERN
description In the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20, followed by a second phase starting in 2024 (LS3). This paper reviews the collimation upgrade plans for LS2, focused on a first impedance reduction of the system, through the installation of collimators based on new materials, and the improvement of collimation cleaning, achieved by adding new collimators in the cold dispersion suppressor regions. The performance of the new system in terms of cleaning inefficiency for proton and lead ion beams is presented.
id oai-inspirehep.net-1743445
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17434452020-09-28T09:48:38Zdoi:10.18429/JACoW-IPAC2019-MOPRB051http://cds.cern.ch/record/2695246engMereghetti, AlessioBruce, RoderikFuster-Martínez, NuriaMirarchi, DanieleRedaelli, StefanoCollimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3Accelerators and Storage RingsIn the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20, followed by a second phase starting in 2024 (LS3). This paper reviews the collimation upgrade plans for LS2, focused on a first impedance reduction of the system, through the installation of collimators based on new materials, and the improvement of collimation cleaning, achieved by adding new collimators in the cold dispersion suppressor regions. The performance of the new system in terms of cleaning inefficiency for proton and lead ion beams is presented.CERN-ACC-2019-077oai:inspirehep.net:17434452019
spellingShingle Accelerators and Storage Rings
Mereghetti, Alessio
Bruce, Roderik
Fuster-Martínez, Nuria
Mirarchi, Daniele
Redaelli, Stefano
Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title_full Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title_fullStr Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title_full_unstemmed Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title_short Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
title_sort collimation system upgrades for the high luminosity large hadron collider and expected cleaning performance in run 3
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPRB051
http://cds.cern.ch/record/2695246
work_keys_str_mv AT mereghettialessio collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3
AT bruceroderik collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3
AT fustermartineznuria collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3
AT mirarchidaniele collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3
AT redaellistefano collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3