Cargando…
Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3
In the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20,...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPRB051 http://cds.cern.ch/record/2695246 |
_version_ | 1780964134931660800 |
---|---|
author | Mereghetti, Alessio Bruce, Roderik Fuster-Martínez, Nuria Mirarchi, Daniele Redaelli, Stefano |
author_facet | Mereghetti, Alessio Bruce, Roderik Fuster-Martínez, Nuria Mirarchi, Daniele Redaelli, Stefano |
author_sort | Mereghetti, Alessio |
collection | CERN |
description | In the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20, followed by a second phase starting in 2024 (LS3). This paper reviews the collimation upgrade plans for LS2, focused on a first impedance reduction of the system, through the installation of collimators based on new materials, and the improvement of collimation cleaning, achieved by adding new collimators in the cold dispersion suppressor regions. The performance of the new system in terms of cleaning inefficiency for proton and lead ion beams is presented. |
id | oai-inspirehep.net-1743445 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-17434452020-09-28T09:48:38Zdoi:10.18429/JACoW-IPAC2019-MOPRB051http://cds.cern.ch/record/2695246engMereghetti, AlessioBruce, RoderikFuster-Martínez, NuriaMirarchi, DanieleRedaelli, StefanoCollimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3Accelerators and Storage RingsIn the framework of the High-Luminosity Large Hadron Collider project (HL-LHC), the LHC collimation system needs important upgrades to cope with the foreseen brighter beams. New collimation hardware will be installed in two phases, the first one during the LHC second Long Shutdown (LS2), in 2019-20, followed by a second phase starting in 2024 (LS3). This paper reviews the collimation upgrade plans for LS2, focused on a first impedance reduction of the system, through the installation of collimators based on new materials, and the improvement of collimation cleaning, achieved by adding new collimators in the cold dispersion suppressor regions. The performance of the new system in terms of cleaning inefficiency for proton and lead ion beams is presented.CERN-ACC-2019-077oai:inspirehep.net:17434452019 |
spellingShingle | Accelerators and Storage Rings Mereghetti, Alessio Bruce, Roderik Fuster-Martínez, Nuria Mirarchi, Daniele Redaelli, Stefano Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title | Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title_full | Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title_fullStr | Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title_full_unstemmed | Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title_short | Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 |
title_sort | collimation system upgrades for the high luminosity large hadron collider and expected cleaning performance in run 3 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPRB051 http://cds.cern.ch/record/2695246 |
work_keys_str_mv | AT mereghettialessio collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3 AT bruceroderik collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3 AT fustermartineznuria collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3 AT mirarchidaniele collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3 AT redaellistefano collimationsystemupgradesforthehighluminositylargehadroncolliderandexpectedcleaningperformanceinrun3 |