Cargando…
Commissioning of a new digital transverse damper system at the PSB
At the CERN Proton Synchrotron Booster, PSB, an analog transverse damper system has been in operation since 1999, providing satisfactory operational results with the proton beam supplied by Linac2. As a consequence of the LHC Injectors Upgrade, the PSB will face new challenges imposed by higher inte...
Autores principales: | Di Giovanni, Gian Piero, Antoniou, Fanouria, Blas, Alfred, Brischetto, Ylenia, Findlay, Alan, Kotzian, Gerd, Mikulec, Bettina, Sterbini, Guido |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-MOPTS085 http://cds.cern.ch/record/2695089 |
Ejemplares similares
-
Beam Tests and Plans for the CERN PS Transverse Damper System
por: Blas, A, et al.
Publicado: (2013) -
LHC Damper Beam commissioning in 2010
por: Höfle, W, et al.
Publicado: (2011) -
" What you get" — Transverse damper
por: Dubouchet, F, et al.
Publicado: (2012) -
Performance of the LHC Transverse Damper with Bunch Trains
por: Hofle, W, et al.
Publicado: (2013) -
Transverse damper operation
por: Höfle, W, et al.
Publicado: (2010)