Update on beam transfer line design for the SPS Beam Dump Facility

The SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to acco...

Descripción completa

Detalles Bibliográficos
Autores principales: Dutheil, Yann, Bauche, Jeremie, Dougherty, Liam, Fraser, Matthew, Goddard, Brennan, Heßler, Christoph, Kain, Verena, Kurdej, Jakub, Uythoven, Jan, Velotti, Francesco
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP027
http://cds.cern.ch/record/2694067
_version_ 1780964093177364480
author Dutheil, Yann
Bauche, Jeremie
Dougherty, Liam
Fraser, Matthew
Goddard, Brennan
Heßler, Christoph
Kain, Verena
Kurdej, Jakub
Uythoven, Jan
Velotti, Francesco
author_facet Dutheil, Yann
Bauche, Jeremie
Dougherty, Liam
Fraser, Matthew
Goddard, Brennan
Heßler, Christoph
Kain, Verena
Kurdej, Jakub
Uythoven, Jan
Velotti, Francesco
author_sort Dutheil, Yann
collection CERN
description The SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate experiments such as SHiP (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with $4 \times 10^{13}$ protons per 1 s spill to achieve $4 \times 10^{19}$ protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. This contribution presents the status of the design work of the new transfer line and discusses the challenges identified. Aperture studies and failure scenarios are treated and the results discussed. In particular, interlock systems aiming at protecting critical components against the uncontrolled loss of the high energy proton beam are considered. We also present the latest results and implications of the design of a new laminated Lambertson splitter magnet to provide fast switching between the current North Area experiments and the BDF.
id oai-inspirehep.net-1745276
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17452762022-04-05T15:15:43Zdoi:10.18429/JACoW-IPAC2019-WEPMP027http://cds.cern.ch/record/2694067engDutheil, YannBauche, JeremieDougherty, LiamFraser, MatthewGoddard, BrennanHeßler, ChristophKain, VerenaKurdej, JakubUythoven, JanVelotti, FrancescoUpdate on beam transfer line design for the SPS Beam Dump FacilityAccelerators and Storage RingsThe SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate experiments such as SHiP (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with $4 \times 10^{13}$ protons per 1 s spill to achieve $4 \times 10^{19}$ protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. This contribution presents the status of the design work of the new transfer line and discusses the challenges identified. Aperture studies and failure scenarios are treated and the results discussed. In particular, interlock systems aiming at protecting critical components against the uncontrolled loss of the high energy proton beam are considered. We also present the latest results and implications of the design of a new laminated Lambertson splitter magnet to provide fast switching between the current North Area experiments and the BDF.CERN-PBC-CONF-2021-001CERN-ACC-2019-180oai:inspirehep.net:17452762019
spellingShingle Accelerators and Storage Rings
Dutheil, Yann
Bauche, Jeremie
Dougherty, Liam
Fraser, Matthew
Goddard, Brennan
Heßler, Christoph
Kain, Verena
Kurdej, Jakub
Uythoven, Jan
Velotti, Francesco
Update on beam transfer line design for the SPS Beam Dump Facility
title Update on beam transfer line design for the SPS Beam Dump Facility
title_full Update on beam transfer line design for the SPS Beam Dump Facility
title_fullStr Update on beam transfer line design for the SPS Beam Dump Facility
title_full_unstemmed Update on beam transfer line design for the SPS Beam Dump Facility
title_short Update on beam transfer line design for the SPS Beam Dump Facility
title_sort update on beam transfer line design for the sps beam dump facility
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP027
http://cds.cern.ch/record/2694067
work_keys_str_mv AT dutheilyann updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT bauchejeremie updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT doughertyliam updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT frasermatthew updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT goddardbrennan updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT heßlerchristoph updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT kainverena updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT kurdejjakub updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT uythovenjan updateonbeamtransferlinedesignforthespsbeamdumpfacility
AT velottifrancesco updateonbeamtransferlinedesignforthespsbeamdumpfacility