Update on beam transfer line design for the SPS Beam Dump Facility
The SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to acco...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP027 http://cds.cern.ch/record/2694067 |
_version_ | 1780964093177364480 |
---|---|
author | Dutheil, Yann Bauche, Jeremie Dougherty, Liam Fraser, Matthew Goddard, Brennan Heßler, Christoph Kain, Verena Kurdej, Jakub Uythoven, Jan Velotti, Francesco |
author_facet | Dutheil, Yann Bauche, Jeremie Dougherty, Liam Fraser, Matthew Goddard, Brennan Heßler, Christoph Kain, Verena Kurdej, Jakub Uythoven, Jan Velotti, Francesco |
author_sort | Dutheil, Yann |
collection | CERN |
description | The SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate experiments such as SHiP (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with $4 \times 10^{13}$ protons per 1 s spill to achieve $4 \times 10^{19}$ protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. This contribution presents the status of the design work of the new transfer line and discusses the challenges identified. Aperture studies and failure scenarios are treated and the results discussed. In particular, interlock systems aiming at protecting critical components against the uncontrolled loss of the high energy proton beam are considered. We also present the latest results and implications of the design of a new laminated Lambertson splitter magnet to provide fast switching between the current North Area experiments and the BDF. |
id | oai-inspirehep.net-1745276 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-17452762022-04-05T15:15:43Zdoi:10.18429/JACoW-IPAC2019-WEPMP027http://cds.cern.ch/record/2694067engDutheil, YannBauche, JeremieDougherty, LiamFraser, MatthewGoddard, BrennanHeßler, ChristophKain, VerenaKurdej, JakubUythoven, JanVelotti, FrancescoUpdate on beam transfer line design for the SPS Beam Dump FacilityAccelerators and Storage RingsThe SPS Beam Dump Facility (BDF) being studied as part of the Physics Beyond Colliders (PBC) CERN project has recently reached an important milestone with the completion of the comprehensive feasibility study. The BDF is a proposed fixed target facility to be installed in the SPS North Area, to accommodate experiments such as SHiP (Search for Hidden Particles), which is most notably aiming at studying hidden sector particles. This experiment requires a high intensity slowly extracted 400 GeV proton beam with $4 \times 10^{13}$ protons per 1 s spill to achieve $4 \times 10^{19}$ protons on target per year. The extraction and transport scheme will make use of the first 600 m of the existing North Area extraction line. This contribution presents the status of the design work of the new transfer line and discusses the challenges identified. Aperture studies and failure scenarios are treated and the results discussed. In particular, interlock systems aiming at protecting critical components against the uncontrolled loss of the high energy proton beam are considered. We also present the latest results and implications of the design of a new laminated Lambertson splitter magnet to provide fast switching between the current North Area experiments and the BDF.CERN-PBC-CONF-2021-001CERN-ACC-2019-180oai:inspirehep.net:17452762019 |
spellingShingle | Accelerators and Storage Rings Dutheil, Yann Bauche, Jeremie Dougherty, Liam Fraser, Matthew Goddard, Brennan Heßler, Christoph Kain, Verena Kurdej, Jakub Uythoven, Jan Velotti, Francesco Update on beam transfer line design for the SPS Beam Dump Facility |
title | Update on beam transfer line design for the SPS Beam Dump Facility |
title_full | Update on beam transfer line design for the SPS Beam Dump Facility |
title_fullStr | Update on beam transfer line design for the SPS Beam Dump Facility |
title_full_unstemmed | Update on beam transfer line design for the SPS Beam Dump Facility |
title_short | Update on beam transfer line design for the SPS Beam Dump Facility |
title_sort | update on beam transfer line design for the sps beam dump facility |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP027 http://cds.cern.ch/record/2694067 |
work_keys_str_mv | AT dutheilyann updateonbeamtransferlinedesignforthespsbeamdumpfacility AT bauchejeremie updateonbeamtransferlinedesignforthespsbeamdumpfacility AT doughertyliam updateonbeamtransferlinedesignforthespsbeamdumpfacility AT frasermatthew updateonbeamtransferlinedesignforthespsbeamdumpfacility AT goddardbrennan updateonbeamtransferlinedesignforthespsbeamdumpfacility AT heßlerchristoph updateonbeamtransferlinedesignforthespsbeamdumpfacility AT kainverena updateonbeamtransferlinedesignforthespsbeamdumpfacility AT kurdejjakub updateonbeamtransferlinedesignforthespsbeamdumpfacility AT uythovenjan updateonbeamtransferlinedesignforthespsbeamdumpfacility AT velottifrancesco updateonbeamtransferlinedesignforthespsbeamdumpfacility |