Design and construction of the CERN SPS extraction protection elements for LIU

At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devices upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the...

Descripción completa

Detalles Bibliográficos
Autores principales: Balhan, Bruno, Baud, Cedric, Borburgh, Jan, Fraser, Matthew, Hourican, Michael, Jorat, Louise Olivia, Nuiry, Francois-Xavier, Pianese, Stefano
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP022
http://cds.cern.ch/record/2693923
_version_ 1780964095730647040
author Balhan, Bruno
Baud, Cedric
Borburgh, Jan
Fraser, Matthew
Hourican, Michael
Jorat, Louise Olivia
Nuiry, Francois-Xavier
Pianese, Stefano
author_facet Balhan, Bruno
Baud, Cedric
Borburgh, Jan
Fraser, Matthew
Hourican, Michael
Jorat, Louise Olivia
Nuiry, Francois-Xavier
Pianese, Stefano
author_sort Balhan, Bruno
collection CERN
description At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devices upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the past, but the definitive approach for the equipment protection upgrade for each channel has now been determined. This paper describes the consequences of the most significant failure scenarios and the impact of the heat deposition in the diluter. The resulting material stresses are evaluated. The detailed layout for the extraction protection equipment for each extraction channel is outlined. The final layout consists of a extended diluter in Long Straight Section (LSS) 6 (TPSG6) and the installation of an additional movable absorber (TPSC4) upstream of the quadrupole in front of the existing protection equipment in LSS 4. The detailed mechanical design of the TPSC4 and the construction status of both TPSC4 and TPSG6 are discussed.
id oai-inspirehep.net-1745322
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17453222022-04-05T15:39:08Zdoi:10.18429/JACoW-IPAC2019-WEPMP022http://cds.cern.ch/record/2693923engBalhan, BrunoBaud, CedricBorburgh, JanFraser, MatthewHourican, MichaelJorat, Louise OliviaNuiry, Francois-XavierPianese, StefanoDesign and construction of the CERN SPS extraction protection elements for LIUAccelerators and Storage RingsAt CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devices upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the past, but the definitive approach for the equipment protection upgrade for each channel has now been determined. This paper describes the consequences of the most significant failure scenarios and the impact of the heat deposition in the diluter. The resulting material stresses are evaluated. The detailed layout for the extraction protection equipment for each extraction channel is outlined. The final layout consists of a extended diluter in Long Straight Section (LSS) 6 (TPSG6) and the installation of an additional movable absorber (TPSC4) upstream of the quadrupole in front of the existing protection equipment in LSS 4. The detailed mechanical design of the TPSC4 and the construction status of both TPSC4 and TPSG6 are discussed.CERN-ACC-2019-191oai:inspirehep.net:17453222019
spellingShingle Accelerators and Storage Rings
Balhan, Bruno
Baud, Cedric
Borburgh, Jan
Fraser, Matthew
Hourican, Michael
Jorat, Louise Olivia
Nuiry, Francois-Xavier
Pianese, Stefano
Design and construction of the CERN SPS extraction protection elements for LIU
title Design and construction of the CERN SPS extraction protection elements for LIU
title_full Design and construction of the CERN SPS extraction protection elements for LIU
title_fullStr Design and construction of the CERN SPS extraction protection elements for LIU
title_full_unstemmed Design and construction of the CERN SPS extraction protection elements for LIU
title_short Design and construction of the CERN SPS extraction protection elements for LIU
title_sort design and construction of the cern sps extraction protection elements for liu
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP022
http://cds.cern.ch/record/2693923
work_keys_str_mv AT balhanbruno designandconstructionofthecernspsextractionprotectionelementsforliu
AT baudcedric designandconstructionofthecernspsextractionprotectionelementsforliu
AT borburghjan designandconstructionofthecernspsextractionprotectionelementsforliu
AT frasermatthew designandconstructionofthecernspsextractionprotectionelementsforliu
AT houricanmichael designandconstructionofthecernspsextractionprotectionelementsforliu
AT joratlouiseolivia designandconstructionofthecernspsextractionprotectionelementsforliu
AT nuiryfrancoisxavier designandconstructionofthecernspsextractionprotectionelementsforliu
AT pianesestefano designandconstructionofthecernspsextractionprotectionelementsforliu