Connection of 12 GHz high power RF from the XBOX 1 high gradient test stand to the CLEAR electron linac

A new RF system is being established at XBOX1 to drive two 100 MV/m CLIC structures in the CLEAR electron linac. In the past, these structures had been powered by RF from PET structures excited by a drive beam. This drive beam is no longer available. The upgrade will reroute power from the 50 MW kly...

Descripción completa

Detalles Bibliográficos
Autores principales: Edwards, Amelia, Catalán Lasheras, Nuria, Gonzalez Anton, Sergio, McMonagle, Gerard, Pitman, Sam, Woolley, Benjamin, del Pozo Romano, Veronica, Dexter, A
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPRB063
http://cds.cern.ch/record/2693526
Descripción
Sumario:A new RF system is being established at XBOX1 to drive two 100 MV/m CLIC structures in the CLEAR electron linac. In the past, these structures had been powered by RF from PET structures excited by a drive beam. This drive beam is no longer available. The upgrade will reroute power from the 50 MW klystron and pulse compressor which was previously used to power the structure in XBOX1. During the upgrade, the LLRF system will be optimised to improve the modulation of the output signals and down-mixing of the returning signals to obtain accurate phase and amplitude information. The design of the improved LLRF and software, along with phase noise measurements and comparisons with the old system are made in this paper.