Cargando…
Connection of 12 GHz high power RF from the XBOX 1 high gradient test stand to the CLEAR electron linac
A new RF system is being established at XBOX1 to drive two 100 MV/m CLIC structures in the CLEAR electron linac. In the past, these structures had been powered by RF from PET structures excited by a drive beam. This drive beam is no longer available. The upgrade will reroute power from the 50 MW kly...
Autores principales: | Edwards, Amelia, Catalán Lasheras, Nuria, Gonzalez Anton, Sergio, McMonagle, Gerard, Pitman, Sam, Woolley, Benjamin, del Pozo Romano, Veronica, Dexter, A |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPRB063 http://cds.cern.ch/record/2693526 |
Ejemplares similares
-
Commissioning of XBox-3: A very high capacity X-band test stand
por: Catalán Lasheras, Nuria, et al.
Publicado: (2017) -
High Gradient Testing of an X-band Crab Cavity at XBox2
por: Woolley, Benjamin, et al.
Publicado: (2015) -
Construction and Commissioning of the S-Band High-Gradient RF Laboratory at IFIC
por: Esperante Pereira, Daniel, et al.
Publicado: (2018) -
Design and Construction of a High-Gradient RF Lab at IFIC-Valencia
por: Vnuchenko, Anna, et al.
Publicado: (2017) -
High Power Conditioning of X-Band RF Components
por: Catalán Lasheras, Nuria, et al.
Publicado: (2018)