Cargando…

The new CERN East Area primary and secondary beams

The East Area at the Proton Synchrotron is one of the intensely used facilities at CERN, serving for over 56 years beams nowadays to more than 20 user teams and experiments for about 200 days of running each year. Besides primary proton and ion beams for the irradiation facilities IRRAD and CHARM, m...

Descripción completa

Detalles Bibliográficos
Autores principales: Montbarbon, Eva, Banerjee, Dipanwita, Bernhard, Johannes, Brethoux, Damien, Brugger, Markus, Carlsen, Bard, Charitonidis, Nikolaos, Ebn Rahmoun, Aboubakr, Evrard, Sebastien, Gatignon, Laurent, Gerbershagen, Alexander, Harrouch, Erwan, Lazzaroni, Michael, Rae, Bastien, Rosenthal, Marcel, Van Dijk, Maarten
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW062
http://cds.cern.ch/record/2693004
_version_ 1780964020122025984
author Montbarbon, Eva
Banerjee, Dipanwita
Bernhard, Johannes
Brethoux, Damien
Brugger, Markus
Carlsen, Bard
Charitonidis, Nikolaos
Ebn Rahmoun, Aboubakr
Evrard, Sebastien
Gatignon, Laurent
Gerbershagen, Alexander
Harrouch, Erwan
Lazzaroni, Michael
Rae, Bastien
Rosenthal, Marcel
Van Dijk, Maarten
author_facet Montbarbon, Eva
Banerjee, Dipanwita
Bernhard, Johannes
Brethoux, Damien
Brugger, Markus
Carlsen, Bard
Charitonidis, Nikolaos
Ebn Rahmoun, Aboubakr
Evrard, Sebastien
Gatignon, Laurent
Gerbershagen, Alexander
Harrouch, Erwan
Lazzaroni, Michael
Rae, Bastien
Rosenthal, Marcel
Van Dijk, Maarten
author_sort Montbarbon, Eva
collection CERN
description The East Area at the Proton Synchrotron is one of the intensely used facilities at CERN, serving for over 56 years beams nowadays to more than 20 user teams and experiments for about 200 days of running each year. Besides primary proton and ion beams for the irradiation facilities IRRAD and CHARM, mixed secondary beams of hadrons, electrons and muons within a range of 0.5 GeV/c to 12 GeV/c are provided. The CERN Management approved an upgrade and a renovation of the full facility to meet reliably future beam test and physics requirements. We present a new, flexible beam design that will assure better purity of the secondary beams, even with the new possibility of highly pure electron, hadron or muon beams. The upgrade also includes a pulsed powering scheme with energy recovering power supplies and new laminated magnets that will reduce both power and cooling requirements. The renovation phase has started already and first beams in the new facility will be delivered from 2021 on.
id oai-inspirehep.net-1745654
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17456542022-04-08T07:33:23Zdoi:10.18429/JACoW-IPAC2019-THPGW062http://cds.cern.ch/record/2693004engMontbarbon, EvaBanerjee, DipanwitaBernhard, JohannesBrethoux, DamienBrugger, MarkusCarlsen, BardCharitonidis, NikolaosEbn Rahmoun, AboubakrEvrard, SebastienGatignon, LaurentGerbershagen, AlexanderHarrouch, ErwanLazzaroni, MichaelRae, BastienRosenthal, MarcelVan Dijk, MaartenThe new CERN East Area primary and secondary beamsAccelerators and Storage RingsThe East Area at the Proton Synchrotron is one of the intensely used facilities at CERN, serving for over 56 years beams nowadays to more than 20 user teams and experiments for about 200 days of running each year. Besides primary proton and ion beams for the irradiation facilities IRRAD and CHARM, mixed secondary beams of hadrons, electrons and muons within a range of 0.5 GeV/c to 12 GeV/c are provided. The CERN Management approved an upgrade and a renovation of the full facility to meet reliably future beam test and physics requirements. We present a new, flexible beam design that will assure better purity of the secondary beams, even with the new possibility of highly pure electron, hadron or muon beams. The upgrade also includes a pulsed powering scheme with energy recovering power supplies and new laminated magnets that will reduce both power and cooling requirements. The renovation phase has started already and first beams in the new facility will be delivered from 2021 on.CERN-ACC-2019-234oai:inspirehep.net:17456542019
spellingShingle Accelerators and Storage Rings
Montbarbon, Eva
Banerjee, Dipanwita
Bernhard, Johannes
Brethoux, Damien
Brugger, Markus
Carlsen, Bard
Charitonidis, Nikolaos
Ebn Rahmoun, Aboubakr
Evrard, Sebastien
Gatignon, Laurent
Gerbershagen, Alexander
Harrouch, Erwan
Lazzaroni, Michael
Rae, Bastien
Rosenthal, Marcel
Van Dijk, Maarten
The new CERN East Area primary and secondary beams
title The new CERN East Area primary and secondary beams
title_full The new CERN East Area primary and secondary beams
title_fullStr The new CERN East Area primary and secondary beams
title_full_unstemmed The new CERN East Area primary and secondary beams
title_short The new CERN East Area primary and secondary beams
title_sort new cern east area primary and secondary beams
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW062
http://cds.cern.ch/record/2693004
work_keys_str_mv AT montbarboneva thenewcerneastareaprimaryandsecondarybeams
AT banerjeedipanwita thenewcerneastareaprimaryandsecondarybeams
AT bernhardjohannes thenewcerneastareaprimaryandsecondarybeams
AT brethouxdamien thenewcerneastareaprimaryandsecondarybeams
AT bruggermarkus thenewcerneastareaprimaryandsecondarybeams
AT carlsenbard thenewcerneastareaprimaryandsecondarybeams
AT charitonidisnikolaos thenewcerneastareaprimaryandsecondarybeams
AT ebnrahmounaboubakr thenewcerneastareaprimaryandsecondarybeams
AT evrardsebastien thenewcerneastareaprimaryandsecondarybeams
AT gatignonlaurent thenewcerneastareaprimaryandsecondarybeams
AT gerbershagenalexander thenewcerneastareaprimaryandsecondarybeams
AT harroucherwan thenewcerneastareaprimaryandsecondarybeams
AT lazzaronimichael thenewcerneastareaprimaryandsecondarybeams
AT raebastien thenewcerneastareaprimaryandsecondarybeams
AT rosenthalmarcel thenewcerneastareaprimaryandsecondarybeams
AT vandijkmaarten thenewcerneastareaprimaryandsecondarybeams
AT montbarboneva newcerneastareaprimaryandsecondarybeams
AT banerjeedipanwita newcerneastareaprimaryandsecondarybeams
AT bernhardjohannes newcerneastareaprimaryandsecondarybeams
AT brethouxdamien newcerneastareaprimaryandsecondarybeams
AT bruggermarkus newcerneastareaprimaryandsecondarybeams
AT carlsenbard newcerneastareaprimaryandsecondarybeams
AT charitonidisnikolaos newcerneastareaprimaryandsecondarybeams
AT ebnrahmounaboubakr newcerneastareaprimaryandsecondarybeams
AT evrardsebastien newcerneastareaprimaryandsecondarybeams
AT gatignonlaurent newcerneastareaprimaryandsecondarybeams
AT gerbershagenalexander newcerneastareaprimaryandsecondarybeams
AT harroucherwan newcerneastareaprimaryandsecondarybeams
AT lazzaronimichael newcerneastareaprimaryandsecondarybeams
AT raebastien newcerneastareaprimaryandsecondarybeams
AT rosenthalmarcel newcerneastareaprimaryandsecondarybeams
AT vandijkmaarten newcerneastareaprimaryandsecondarybeams