Cargando…
Implementation of CERN secondary beam lines T9 and T10 in BDSIM
CERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experi...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW069 https://dx.doi.org/10.1088/1742-6596/1350/1/012095 http://cds.cern.ch/record/2693147 |
_version_ | 1780964020336984064 |
---|---|
author | D'Alessandro, Gian Luigi Bernhard, Johannes Boogert, Stewart Gerbershagen, Alexander Gibson, Stephen Nevay, Laurence Rosenthal, Marcel Shields, William |
author_facet | D'Alessandro, Gian Luigi Bernhard, Johannes Boogert, Stewart Gerbershagen, Alexander Gibson, Stephen Nevay, Laurence Rosenthal, Marcel Shields, William |
author_sort | D'Alessandro, Gian Luigi |
collection | CERN |
description | CERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experiments. A correct operation of the beam lines requires precise simulations of the beam optics and studies on the beam-matter interaction, radiation protection, beam equipment survival etc. BDSIM combines tracking studies with energy deposition and beam-matter interaction simulations within one software framework. This paper presents studies conducted on secondary beams with BDSIM for the beam lines T9 and T10. We report the tracking analysis and the energy deposition along the beam line. Tracking analysis validation is demonstrated via comparison to existing code. |
id | oai-inspirehep.net-1745655 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-17456552022-04-08T07:25:56Zdoi:10.18429/JACoW-IPAC2019-THPGW069doi:10.1088/1742-6596/1350/1/012095http://cds.cern.ch/record/2693147engD'Alessandro, Gian LuigiBernhard, JohannesBoogert, StewartGerbershagen, AlexanderGibson, StephenNevay, LaurenceRosenthal, MarcelShields, WilliamImplementation of CERN secondary beam lines T9 and T10 in BDSIMAccelerators and Storage RingsCERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experiments. A correct operation of the beam lines requires precise simulations of the beam optics and studies on the beam-matter interaction, radiation protection, beam equipment survival etc. BDSIM combines tracking studies with energy deposition and beam-matter interaction simulations within one software framework. This paper presents studies conducted on secondary beams with BDSIM for the beam lines T9 and T10. We report the tracking analysis and the energy deposition along the beam line. Tracking analysis validation is demonstrated via comparison to existing code.CERN-ACC-2019-223oai:inspirehep.net:17456552019 |
spellingShingle | Accelerators and Storage Rings D'Alessandro, Gian Luigi Bernhard, Johannes Boogert, Stewart Gerbershagen, Alexander Gibson, Stephen Nevay, Laurence Rosenthal, Marcel Shields, William Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title | Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title_full | Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title_fullStr | Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title_full_unstemmed | Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title_short | Implementation of CERN secondary beam lines T9 and T10 in BDSIM |
title_sort | implementation of cern secondary beam lines t9 and t10 in bdsim |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW069 https://dx.doi.org/10.1088/1742-6596/1350/1/012095 http://cds.cern.ch/record/2693147 |
work_keys_str_mv | AT dalessandrogianluigi implementationofcernsecondarybeamlinest9andt10inbdsim AT bernhardjohannes implementationofcernsecondarybeamlinest9andt10inbdsim AT boogertstewart implementationofcernsecondarybeamlinest9andt10inbdsim AT gerbershagenalexander implementationofcernsecondarybeamlinest9andt10inbdsim AT gibsonstephen implementationofcernsecondarybeamlinest9andt10inbdsim AT nevaylaurence implementationofcernsecondarybeamlinest9andt10inbdsim AT rosenthalmarcel implementationofcernsecondarybeamlinest9andt10inbdsim AT shieldswilliam implementationofcernsecondarybeamlinest9andt10inbdsim |