Cargando…

Implementation of CERN secondary beam lines T9 and T10 in BDSIM

CERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experi...

Descripción completa

Detalles Bibliográficos
Autores principales: D'Alessandro, Gian Luigi, Bernhard, Johannes, Boogert, Stewart, Gerbershagen, Alexander, Gibson, Stephen, Nevay, Laurence, Rosenthal, Marcel, Shields, William
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW069
https://dx.doi.org/10.1088/1742-6596/1350/1/012095
http://cds.cern.ch/record/2693147
_version_ 1780964020336984064
author D'Alessandro, Gian Luigi
Bernhard, Johannes
Boogert, Stewart
Gerbershagen, Alexander
Gibson, Stephen
Nevay, Laurence
Rosenthal, Marcel
Shields, William
author_facet D'Alessandro, Gian Luigi
Bernhard, Johannes
Boogert, Stewart
Gerbershagen, Alexander
Gibson, Stephen
Nevay, Laurence
Rosenthal, Marcel
Shields, William
author_sort D'Alessandro, Gian Luigi
collection CERN
description CERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experiments. A correct operation of the beam lines requires precise simulations of the beam optics and studies on the beam-matter interaction, radiation protection, beam equipment survival etc. BDSIM combines tracking studies with energy deposition and beam-matter interaction simulations within one software framework. This paper presents studies conducted on secondary beams with BDSIM for the beam lines T9 and T10. We report the tracking analysis and the energy deposition along the beam line. Tracking analysis validation is demonstrated via comparison to existing code.
id oai-inspirehep.net-1745655
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17456552022-04-08T07:25:56Zdoi:10.18429/JACoW-IPAC2019-THPGW069doi:10.1088/1742-6596/1350/1/012095http://cds.cern.ch/record/2693147engD'Alessandro, Gian LuigiBernhard, JohannesBoogert, StewartGerbershagen, AlexanderGibson, StephenNevay, LaurenceRosenthal, MarcelShields, WilliamImplementation of CERN secondary beam lines T9 and T10 in BDSIMAccelerators and Storage RingsCERN has a unique set of secondary beam lines, which deliver particle beams extracted from the PS and SPS accelerators after their interaction with a target, reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities and host several fixed target experiments. A correct operation of the beam lines requires precise simulations of the beam optics and studies on the beam-matter interaction, radiation protection, beam equipment survival etc. BDSIM combines tracking studies with energy deposition and beam-matter interaction simulations within one software framework. This paper presents studies conducted on secondary beams with BDSIM for the beam lines T9 and T10. We report the tracking analysis and the energy deposition along the beam line. Tracking analysis validation is demonstrated via comparison to existing code.CERN-ACC-2019-223oai:inspirehep.net:17456552019
spellingShingle Accelerators and Storage Rings
D'Alessandro, Gian Luigi
Bernhard, Johannes
Boogert, Stewart
Gerbershagen, Alexander
Gibson, Stephen
Nevay, Laurence
Rosenthal, Marcel
Shields, William
Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title_full Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title_fullStr Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title_full_unstemmed Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title_short Implementation of CERN secondary beam lines T9 and T10 in BDSIM
title_sort implementation of cern secondary beam lines t9 and t10 in bdsim
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW069
https://dx.doi.org/10.1088/1742-6596/1350/1/012095
http://cds.cern.ch/record/2693147
work_keys_str_mv AT dalessandrogianluigi implementationofcernsecondarybeamlinest9andt10inbdsim
AT bernhardjohannes implementationofcernsecondarybeamlinest9andt10inbdsim
AT boogertstewart implementationofcernsecondarybeamlinest9andt10inbdsim
AT gerbershagenalexander implementationofcernsecondarybeamlinest9andt10inbdsim
AT gibsonstephen implementationofcernsecondarybeamlinest9andt10inbdsim
AT nevaylaurence implementationofcernsecondarybeamlinest9andt10inbdsim
AT rosenthalmarcel implementationofcernsecondarybeamlinest9andt10inbdsim
AT shieldswilliam implementationofcernsecondarybeamlinest9andt10inbdsim