Cargando…

Commissioning results of the tertiary beam lines for the CERN neutrino platform project

For many decades the CERN North Area facility at the Super Proton Synchrotron (SPS) has delivered secondary beams to various fixed target experiments and test beams. In 2018, two new tertiary extensions of the existing beam lines, designated “H2-VLE” and “H4-VLE”, have been constructed and successfu...

Descripción completa

Detalles Bibliográficos
Autores principales: Rosenthal, Marcel, Booth, Alexander, Charitonidis, Nikolaos, Chatzidaki, Panagiota, Karyotakis, Yannis, Nowak, Elzbieta, Ortega Ruiz, Inaki, Sala, Paola
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW064
https://dx.doi.org/10.1088/1742-6596/1350/1/012094
http://cds.cern.ch/record/2692794
_version_ 1780964022676357120
author Rosenthal, Marcel
Booth, Alexander
Charitonidis, Nikolaos
Chatzidaki, Panagiota
Karyotakis, Yannis
Nowak, Elzbieta
Ortega Ruiz, Inaki
Sala, Paola
author_facet Rosenthal, Marcel
Booth, Alexander
Charitonidis, Nikolaos
Chatzidaki, Panagiota
Karyotakis, Yannis
Nowak, Elzbieta
Ortega Ruiz, Inaki
Sala, Paola
author_sort Rosenthal, Marcel
collection CERN
description For many decades the CERN North Area facility at the Super Proton Synchrotron (SPS) has delivered secondary beams to various fixed target experiments and test beams. In 2018, two new tertiary extensions of the existing beam lines, designated “H2-VLE” and “H4-VLE”, have been constructed and successfully commissioned. These beam lines have been designed to provide charged particles of both polarities in the momentum range from 0.3 GeV/c to 12 GeV/c. During the design phase, multiple simulation tools and techniques have been employed to optimize the tertiary beam line layout in terms of particle production, transverse beam dynamics and particle identification on an event-by-event basis. In this paper, a comparison of the simulated performance and the first measurement results obtained during the commissioning phase are presented.
id oai-inspirehep.net-1745724
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17457242022-04-08T07:38:06Zdoi:10.18429/JACoW-IPAC2019-THPGW064doi:10.1088/1742-6596/1350/1/012094http://cds.cern.ch/record/2692794engRosenthal, MarcelBooth, AlexanderCharitonidis, NikolaosChatzidaki, PanagiotaKaryotakis, YannisNowak, ElzbietaOrtega Ruiz, InakiSala, PaolaCommissioning results of the tertiary beam lines for the CERN neutrino platform projectAccelerators and Storage RingsFor many decades the CERN North Area facility at the Super Proton Synchrotron (SPS) has delivered secondary beams to various fixed target experiments and test beams. In 2018, two new tertiary extensions of the existing beam lines, designated “H2-VLE” and “H4-VLE”, have been constructed and successfully commissioned. These beam lines have been designed to provide charged particles of both polarities in the momentum range from 0.3 GeV/c to 12 GeV/c. During the design phase, multiple simulation tools and techniques have been employed to optimize the tertiary beam line layout in terms of particle production, transverse beam dynamics and particle identification on an event-by-event basis. In this paper, a comparison of the simulated performance and the first measurement results obtained during the commissioning phase are presented.CERN-ACC-2019-241oai:inspirehep.net:17457242019
spellingShingle Accelerators and Storage Rings
Rosenthal, Marcel
Booth, Alexander
Charitonidis, Nikolaos
Chatzidaki, Panagiota
Karyotakis, Yannis
Nowak, Elzbieta
Ortega Ruiz, Inaki
Sala, Paola
Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title_full Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title_fullStr Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title_full_unstemmed Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title_short Commissioning results of the tertiary beam lines for the CERN neutrino platform project
title_sort commissioning results of the tertiary beam lines for the cern neutrino platform project
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IPAC2019-THPGW064
https://dx.doi.org/10.1088/1742-6596/1350/1/012094
http://cds.cern.ch/record/2692794
work_keys_str_mv AT rosenthalmarcel commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT boothalexander commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT charitonidisnikolaos commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT chatzidakipanagiota commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT karyotakisyannis commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT nowakelzbieta commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT ortegaruizinaki commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject
AT salapaola commissioningresultsofthetertiarybeamlinesforthecernneutrinoplatformproject