Cargando…

DC testing and phase resolved partial discharge measurements of the new trigger transformers for the LHC beam dump kickers

During LS2, the LHC beam dump kicker pulse generators will be subject to a substantial consolidation program. One major part is the replacement of the existing GTO stack trigger transformer by a new more performant one. The transformer is assembled, moulded, and tested in-house. Part of the validati...

Descripción completa

Detalles Bibliográficos
Autores principales: Stadlbauer, Tobias, Chmielinska, Agnieszka, Ducimetière, Laurent, Kontelis, Dimitrios, Kramer, Thomas, Senaj, Viliam
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2019-THPRB079
http://cds.cern.ch/record/2690545
Descripción
Sumario:During LS2, the LHC beam dump kicker pulse generators will be subject to a substantial consolidation program. One major part is the replacement of the existing GTO stack trigger transformer by a new more performant one. The transformer is assembled, moulded, and tested in-house. Part of the validation procedure are standard DC tests and subsequent discharge monitoring as well as newly introduced phase resolved partial discharge measurements. This paper briefly highlights the trigger transformer parameters and construction and outlines in detail the testing and partial discharge measurements. It concludes with a comparison and analysis of the results of the different measurement techniques.