DC testing and phase resolved partial discharge measurements of the new trigger transformers for the LHC beam dump kickers
During LS2, the LHC beam dump kicker pulse generators will be subject to a substantial consolidation program. One major part is the replacement of the existing GTO stack trigger transformer by a new more performant one. The transformer is assembled, moulded, and tested in-house. Part of the validati...
Autores principales: | Stadlbauer, Tobias, Chmielinska, Agnieszka, Ducimetière, Laurent, Kontelis, Dimitrios, Kramer, Thomas, Senaj, Viliam |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-THPRB079 http://cds.cern.ch/record/2690545 |
Ejemplares similares
-
Considerations on an Upgrade Possibility of the LHC Beam Dump Kicker System
por: Fraser, Matthew, et al.
Publicado: (2016) -
Considerations for the Injection and Extraction Kicker Systems of a 100 TeV Centre-of-Mass FCC-hh Collider
por: Kramer, Thomas, et al.
Publicado: (2016) -
Machine protection aspects of high-voltage flashovers of the LHC beam dump dilution kickers
por: Wiesner, Christoph, et al.
Publicado: (2019) -
Feasibility Study of the Fast SPS Ion Injection Kicker System
por: Ferrero Colomo, Alvaro, et al.
Publicado: (2016) -
Transverse impedance measurements and simulations of the LHC injection kicker magnet
por: Vlachodimitropoulos, Vasileios, et al.
Publicado: (2019)