Cargando…
Remote Control Unit of the LHC Injector Complex Beam Loss Monitoring System
The strategy for beam set-up and machine protection of the accelerators at the European Organization for Nuclear Research (CERN) relies strongly on their Beam Loss Monitoring (BLM) systems. The BLM system of the CERN PS complex (PS, PS Booster and Linac4) was recently renovated. The upgrade aimed to...
Autores principales: | Calvo Giraldo, Eva, Viganó, William, Zamantzas, Christos |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.343.0070 http://cds.cern.ch/record/2710213 |
Ejemplares similares
-
The Beam Loss Monitoring System after LHC Injectors Upgrade at CERN
por: Saccani, Mathieu, et al.
Publicado: (2021) -
Beam Loss Monitoring for LHC Machine Protection
por: Holzer, Eva Barbara, et al.
Publicado: (2012) -
System Architecture for measuring and monitoring Beam Losses in the Injector Complex at CERN
por: Zamantzas, C, et al.
Publicado: (2012) -
Construction of a Mobile Irradiation Instrument for the Verification of the CERN LHC Beam Loss Monitoring System
por: Gudkov, Dmitry, et al.
Publicado: (2018) -
The Diamond Beam Loss Monitoring System at CERN LHC and SPS
por: Calvo Giraldo, Eva, et al.
Publicado: (2022)