Cargando…
LHCb Run 2 trigger and upgrade reconstruction
The LHCb trigger strategy for Run II (2015-2018) and the upgrade era from Run III (2021) onwards are discussed. A crucial aspect of the LHCb upgrade is the removal of the hardware trigger, so LHCb will move to a fully software based trigger. The latest studies and progress from the upgrade tracking...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.340.0225 http://cds.cern.ch/record/2703016 |
Sumario: | The LHCb trigger strategy for Run II (2015-2018) and the upgrade era from Run III (2021) onwards are discussed. A crucial aspect of the LHCb upgrade is the removal of the hardware trigger, so LHCb will move to a fully software based trigger. The latest studies and progress from the upgrade tracking and reconstruction sequence, that will form the basis of the upgrade trigger, are presented. |
---|