Cargando…
LHCb Run 2 trigger and upgrade reconstruction
The LHCb trigger strategy for Run II (2015-2018) and the upgrade era from Run III (2021) onwards are discussed. A crucial aspect of the LHCb upgrade is the removal of the hardware trigger, so LHCb will move to a fully software based trigger. The latest studies and progress from the upgrade tracking...
Autor principal: | Whitehead, Mark |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.340.0225 http://cds.cern.ch/record/2703016 |
Ejemplares similares
-
The upgrade of the LHCb trigger for Run III
por: Whitehead, Mark Peter
Publicado: (2018) -
LHCb Run 2 trigger and upgrade reconstruction
por: Whitehead, Mark Peter
Publicado: (2018) -
The upgrade of the LHCb trigger for Run III
por: Whitehead, Mark Peter
Publicado: (2017) -
The LHCb trigger and its upgrade
por: Dziurda, A
Publicado: (2016) -
The upgrade of the LHCb trigger system
por: Albrecht, J., et al.
Publicado: (2014)