Cargando…
Tests and investigation towards the final design of the GEM front-end electronics
During the second long shut-down of the LHC, the first endcap station of the CMS muon system will be upgraded using Triple Gas Electron Multiplier (GEM) detectors. In order to gain first operational experience, a limited number of chambers has been installed in January 2017 as a "slice test&quo...
Autores principales: | Aruta, Caterina, Simone, Federica, Ivone, Francesco, Domey, Brian L, Merlin, Jeremie A, Starling, Elizabeth R |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/IWASI.2019.8791335 http://cds.cern.ch/record/2701392 |
Ejemplares similares
-
The CMS GEM Detector Front-end Electronics – Characterization and Implementation
por: Irshad, Aamir
Publicado: (2022) -
Tests of the front-end electronics for the GEM chambers of the CMS experiment
por: Kovalenko, Danylo
Publicado: (2022) -
GEM Sustained Operations studies
por: Aruta, Caterina
Publicado: (2019) -
LHCb Preshower Front-End Electronics Board. Qualification of the final prototype
por: Bonnefoy, R, et al.
Publicado: (2007) -
A GEM-TPC prototype with low-Noise highly integrated front-end electronics for linear collider studies
por: Kappler, Steffen, et al.
Publicado: (2004)