Cargando…
Combined Testing And Validation Strategy For The New LHC Blm Processing Module
A comprehensive strategy to test a new digital acquisition board has been implemented by the Beam Instrumentation Group of the European Organization for Nuclear Research (CERN) as part of a wider methodology for the design, production, test, and operation of high dependability electronic systems. Th...
Autores principales: | Schramm, V, Saccani, M, Viganò, W, Bertsche, B |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/RAMS.2019.8769268 http://cds.cern.ch/record/2701395 |
Ejemplares similares
-
Self Testing Functionality of the LHC BLM System
por: Dehning, B, et al.
Publicado: (2011) -
BLM Crosstalk Studies on the CLIC Two-Beam Module
por: Kastriotou, Maria, et al.
Publicado: (2016) -
Handling of BLM abort thresholds in the LHC
por: Nebot Del Busto, E, et al.
Publicado: (2011) -
Commissioning and optimization of the LHC BLM System
por: Holzer, E B, et al.
Publicado: (2010) -
A BLM system for the LHC ring
por: Bovet, Claude
Publicado: (2000)