From manufacture to assembly of the ITER central solenoid

The Central Solenoid (CS), a key component of the ITER Magnet system, using a 45 kA Nb 3 Sn conductor, includes six identical coils, called modules, to form a solenoid, enclosed inside a structure providing vertical pre-compression and mechanical support. Procurement of the components of the ITER CS...

Descripción completa

Detalles Bibliográficos
Autores principales: Libeyre, P, Schild, T, Bruton, A, Cormany, C, Dolgetta, N, Gaxiola, E, Jong, C, Mitchell, N, Evans, D, Levesy, B, Bedakihale, V, Garcia Sanchez, P, Mariani, A, Okugawa, R, Reiersen, W, Martovetsky, N, Everitt, D, Hughes, D, Reagan, T, Freudenberg, K, Hatfield, D, Chae, T, Vandergriff, D, Sgobba, S, Aviles, I, Decool, P, Vallet, J C, Nunio, F
Lenguaje:eng
Publicado: 2019
Acceso en línea:https://dx.doi.org/10.1016/j.fusengdes.2018.12.086
http://cds.cern.ch/record/2689004
_version_ 1780963723622481920
author Libeyre, P
Schild, T
Bruton, A
Cormany, C
Dolgetta, N
Gaxiola, E
Jong, C
Mitchell, N
Evans, D
Levesy, B
Bedakihale, V
Garcia Sanchez, P
Mariani, A
Okugawa, R
Reiersen, W
Martovetsky, N
Everitt, D
Hughes, D
Reagan, T
Freudenberg, K
Hatfield, D
Chae, T
Vandergriff, D
Sgobba, S
Aviles, I
Decool, P
Vallet, J C
Nunio, F
author_facet Libeyre, P
Schild, T
Bruton, A
Cormany, C
Dolgetta, N
Gaxiola, E
Jong, C
Mitchell, N
Evans, D
Levesy, B
Bedakihale, V
Garcia Sanchez, P
Mariani, A
Okugawa, R
Reiersen, W
Martovetsky, N
Everitt, D
Hughes, D
Reagan, T
Freudenberg, K
Hatfield, D
Chae, T
Vandergriff, D
Sgobba, S
Aviles, I
Decool, P
Vallet, J C
Nunio, F
author_sort Libeyre, P
collection CERN
description The Central Solenoid (CS), a key component of the ITER Magnet system, using a 45 kA Nb 3 Sn conductor, includes six identical coils, called modules, to form a solenoid, enclosed inside a structure providing vertical pre-compression and mechanical support. Procurement of the components of the ITER CS is the responsibility of US ITER, the US Domestic Agency (USDA), while the assembly of these components will be carried out by the ITER Organization (IO). Procurement of all the coil modules was awarded in 2011 to General Atomics, while procurement of the structure is split among several manufacturers, using existing equipment, sometimes among the largest ones in the world. Assembly of the ITER CS will require a dedicated area in the ITER Assembly Hall, conventional tooling and special tooling. US ITER is in charge of the procurement of special tooling, while IO is responsible for the procurement of the conventional ones. A detailed assembly procedure is under development at US ITER, in close collaboration with IO and with the support of CEA. Procurement of the special Assembly Tooling is carried out by US ITER and the main part of the first item, the Assembly Platform, was delivered to IO in 2017.
id oai-inspirehep.net-1750842
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17508422019-10-04T14:04:22Zdoi:10.1016/j.fusengdes.2018.12.086http://cds.cern.ch/record/2689004engLibeyre, PSchild, TBruton, ACormany, CDolgetta, NGaxiola, EJong, CMitchell, NEvans, DLevesy, BBedakihale, VGarcia Sanchez, PMariani, AOkugawa, RReiersen, WMartovetsky, NEveritt, DHughes, DReagan, TFreudenberg, KHatfield, DChae, TVandergriff, DSgobba, SAviles, IDecool, PVallet, J CNunio, FFrom manufacture to assembly of the ITER central solenoidThe Central Solenoid (CS), a key component of the ITER Magnet system, using a 45 kA Nb 3 Sn conductor, includes six identical coils, called modules, to form a solenoid, enclosed inside a structure providing vertical pre-compression and mechanical support. Procurement of the components of the ITER CS is the responsibility of US ITER, the US Domestic Agency (USDA), while the assembly of these components will be carried out by the ITER Organization (IO). Procurement of all the coil modules was awarded in 2011 to General Atomics, while procurement of the structure is split among several manufacturers, using existing equipment, sometimes among the largest ones in the world. Assembly of the ITER CS will require a dedicated area in the ITER Assembly Hall, conventional tooling and special tooling. US ITER is in charge of the procurement of special tooling, while IO is responsible for the procurement of the conventional ones. A detailed assembly procedure is under development at US ITER, in close collaboration with IO and with the support of CEA. Procurement of the special Assembly Tooling is carried out by US ITER and the main part of the first item, the Assembly Platform, was delivered to IO in 2017.oai:inspirehep.net:17508422019
spellingShingle Libeyre, P
Schild, T
Bruton, A
Cormany, C
Dolgetta, N
Gaxiola, E
Jong, C
Mitchell, N
Evans, D
Levesy, B
Bedakihale, V
Garcia Sanchez, P
Mariani, A
Okugawa, R
Reiersen, W
Martovetsky, N
Everitt, D
Hughes, D
Reagan, T
Freudenberg, K
Hatfield, D
Chae, T
Vandergriff, D
Sgobba, S
Aviles, I
Decool, P
Vallet, J C
Nunio, F
From manufacture to assembly of the ITER central solenoid
title From manufacture to assembly of the ITER central solenoid
title_full From manufacture to assembly of the ITER central solenoid
title_fullStr From manufacture to assembly of the ITER central solenoid
title_full_unstemmed From manufacture to assembly of the ITER central solenoid
title_short From manufacture to assembly of the ITER central solenoid
title_sort from manufacture to assembly of the iter central solenoid
url https://dx.doi.org/10.1016/j.fusengdes.2018.12.086
http://cds.cern.ch/record/2689004
work_keys_str_mv AT libeyrep frommanufacturetoassemblyoftheitercentralsolenoid
AT schildt frommanufacturetoassemblyoftheitercentralsolenoid
AT brutona frommanufacturetoassemblyoftheitercentralsolenoid
AT cormanyc frommanufacturetoassemblyoftheitercentralsolenoid
AT dolgettan frommanufacturetoassemblyoftheitercentralsolenoid
AT gaxiolae frommanufacturetoassemblyoftheitercentralsolenoid
AT jongc frommanufacturetoassemblyoftheitercentralsolenoid
AT mitchelln frommanufacturetoassemblyoftheitercentralsolenoid
AT evansd frommanufacturetoassemblyoftheitercentralsolenoid
AT levesyb frommanufacturetoassemblyoftheitercentralsolenoid
AT bedakihalev frommanufacturetoassemblyoftheitercentralsolenoid
AT garciasanchezp frommanufacturetoassemblyoftheitercentralsolenoid
AT mariania frommanufacturetoassemblyoftheitercentralsolenoid
AT okugawar frommanufacturetoassemblyoftheitercentralsolenoid
AT reiersenw frommanufacturetoassemblyoftheitercentralsolenoid
AT martovetskyn frommanufacturetoassemblyoftheitercentralsolenoid
AT everittd frommanufacturetoassemblyoftheitercentralsolenoid
AT hughesd frommanufacturetoassemblyoftheitercentralsolenoid
AT reagant frommanufacturetoassemblyoftheitercentralsolenoid
AT freudenbergk frommanufacturetoassemblyoftheitercentralsolenoid
AT hatfieldd frommanufacturetoassemblyoftheitercentralsolenoid
AT chaet frommanufacturetoassemblyoftheitercentralsolenoid
AT vandergriffd frommanufacturetoassemblyoftheitercentralsolenoid
AT sgobbas frommanufacturetoassemblyoftheitercentralsolenoid
AT avilesi frommanufacturetoassemblyoftheitercentralsolenoid
AT decoolp frommanufacturetoassemblyoftheitercentralsolenoid
AT valletjc frommanufacturetoassemblyoftheitercentralsolenoid
AT nuniof frommanufacturetoassemblyoftheitercentralsolenoid