Cargando…

Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule

For the first prototype PIP-II SSR1 cryomodule, an alignment monitor system based on HBCAM will be used. The main focus will be changes in alignment due to shipping and handling or during cool down and operation process. The SSR1 cryomodule contains eight 325 MHz superconducting single spoke cavitie...

Descripción completa

Detalles Bibliográficos
Autores principales: Cheban, Sergey, Kautzmann, Guillaume, Passarelli, Donato, Zorzetti, Silvia
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-SRF2019-MOP102
http://cds.cern.ch/record/2712607
_version_ 1780965389460570112
author Cheban, Sergey
Kautzmann, Guillaume
Passarelli, Donato
Zorzetti, Silvia
author_facet Cheban, Sergey
Kautzmann, Guillaume
Passarelli, Donato
Zorzetti, Silvia
author_sort Cheban, Sergey
collection CERN
description For the first prototype PIP-II SSR1 cryomodule, an alignment monitor system based on HBCAM will be used. The main focus will be changes in alignment due to shipping and handling or during cool down and operation process. The SSR1 cryomodule contains eight 325 MHz superconducting single spoke cavities and four solenoid’based focusing lenses, and an alignment error better than 0.5 mm RMS for the transverse solenoid, based on function requirement specification. The alignment monitor system has been configured to the objectives of SSR1 cryomodule: low space for integration; presence of magnetic fields; exposure to non-standard environmental conditions such as high vacuum and cryogenic temperatures. The mechanical design and first results of system performance will be presented.
id oai-inspirehep.net-1780409
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17804092020-03-10T20:26:45Zdoi:10.18429/JACoW-SRF2019-MOP102http://cds.cern.ch/record/2712607engCheban, SergeyKautzmann, GuillaumePassarelli, DonatoZorzetti, SilviaAlignment Monitoring System for the PIP-II Prototype SSR1 CryomoduleAccelerators and Storage RingsFor the first prototype PIP-II SSR1 cryomodule, an alignment monitor system based on HBCAM will be used. The main focus will be changes in alignment due to shipping and handling or during cool down and operation process. The SSR1 cryomodule contains eight 325 MHz superconducting single spoke cavities and four solenoid’based focusing lenses, and an alignment error better than 0.5 mm RMS for the transverse solenoid, based on function requirement specification. The alignment monitor system has been configured to the objectives of SSR1 cryomodule: low space for integration; presence of magnetic fields; exposure to non-standard environmental conditions such as high vacuum and cryogenic temperatures. The mechanical design and first results of system performance will be presented.oai:inspirehep.net:17804092019
spellingShingle Accelerators and Storage Rings
Cheban, Sergey
Kautzmann, Guillaume
Passarelli, Donato
Zorzetti, Silvia
Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title_full Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title_fullStr Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title_full_unstemmed Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title_short Alignment Monitoring System for the PIP-II Prototype SSR1 Cryomodule
title_sort alignment monitoring system for the pip-ii prototype ssr1 cryomodule
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-SRF2019-MOP102
http://cds.cern.ch/record/2712607
work_keys_str_mv AT chebansergey alignmentmonitoringsystemforthepipiiprototypessr1cryomodule
AT kautzmannguillaume alignmentmonitoringsystemforthepipiiprototypessr1cryomodule
AT passarellidonato alignmentmonitoringsystemforthepipiiprototypessr1cryomodule
AT zorzettisilvia alignmentmonitoringsystemforthepipiiprototypessr1cryomodule