The LHC accelerating RF system consists of two cryomodules per beam, each containing four single-cell niobium sputtered 400.8 MHz superconducting cavities working at 4.5 K and an average accelerating voltage of 2 MV. The paper summarises the experience, availability and evolution of the system withi...

Descripción completa

Detalles Bibliográficos
Autores principales: Turaj, Katarzyna, Arnaudon, Luca, Baudrenghien, Philippe, Brunner, Olivier, Butterworth, Andrew, Gerigk, Frank, Karppinen, Mikko, Maesen, Pierre, Montesinos, Eric, Peauger, Franck, Rosaz, Guillaume, Shaposhnikova, Elena, Smekens, David, Taborelli, Mauro, Therasse, Mathieu, Timko, Helga, Valuch, Daniel, Valverde Alonso, Nuria, Venturini Delsolaro, Walter
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-SRF2019-THP031
http://cds.cern.ch/record/2712616
_version_ 1780965391433990144
author Turaj, Katarzyna
Arnaudon, Luca
Baudrenghien, Philippe
Brunner, Olivier
Butterworth, Andrew
Gerigk, Frank
Karppinen, Mikko
Maesen, Pierre
Montesinos, Eric
Peauger, Franck
Rosaz, Guillaume
Shaposhnikova, Elena
Smekens, David
Taborelli, Mauro
Therasse, Mathieu
Timko, Helga
Valuch, Daniel
Valverde Alonso, Nuria
Venturini Delsolaro, Walter
author_facet Turaj, Katarzyna
Arnaudon, Luca
Baudrenghien, Philippe
Brunner, Olivier
Butterworth, Andrew
Gerigk, Frank
Karppinen, Mikko
Maesen, Pierre
Montesinos, Eric
Peauger, Franck
Rosaz, Guillaume
Shaposhnikova, Elena
Smekens, David
Taborelli, Mauro
Therasse, Mathieu
Timko, Helga
Valuch, Daniel
Valverde Alonso, Nuria
Venturini Delsolaro, Walter
author_sort Turaj, Katarzyna
collection CERN
description The LHC accelerating RF system consists of two cryomodules per beam, each containing four single-cell niobium sputtered 400.8 MHz superconducting cavities working at 4.5 K and an average accelerating voltage of 2 MV. The paper summarises the experience, availability and evolution of the system within 10 years of operation. The lessons learned from the successful replacement and re-commissioning of one cryomodule with a spare module, and the recent re-test of the originally installed module on the test stand are also included. Finally, a review of currently launched spare cavity production and long-term developments are presented.
id oai-inspirehep.net-1780592
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-17805922020-03-10T20:26:46Zdoi:10.18429/JACoW-SRF2019-THP031http://cds.cern.ch/record/2712616engTuraj, KatarzynaArnaudon, LucaBaudrenghien, PhilippeBrunner, OlivierButterworth, AndrewGerigk, FrankKarppinen, MikkoMaesen, PierreMontesinos, EricPeauger, FranckRosaz, GuillaumeShaposhnikova, ElenaSmekens, DavidTaborelli, MauroTherasse, MathieuTimko, HelgaValuch, DanielValverde Alonso, NuriaVenturini Delsolaro, WalterOperation Experience with the LHC ACS RF SystemAccelerators and Storage RingsThe LHC accelerating RF system consists of two cryomodules per beam, each containing four single-cell niobium sputtered 400.8 MHz superconducting cavities working at 4.5 K and an average accelerating voltage of 2 MV. The paper summarises the experience, availability and evolution of the system within 10 years of operation. The lessons learned from the successful replacement and re-commissioning of one cryomodule with a spare module, and the recent re-test of the originally installed module on the test stand are also included. Finally, a review of currently launched spare cavity production and long-term developments are presented.SRF2019oai:inspirehep.net:17805922019
spellingShingle Accelerators and Storage Rings
Turaj, Katarzyna
Arnaudon, Luca
Baudrenghien, Philippe
Brunner, Olivier
Butterworth, Andrew
Gerigk, Frank
Karppinen, Mikko
Maesen, Pierre
Montesinos, Eric
Peauger, Franck
Rosaz, Guillaume
Shaposhnikova, Elena
Smekens, David
Taborelli, Mauro
Therasse, Mathieu
Timko, Helga
Valuch, Daniel
Valverde Alonso, Nuria
Venturini Delsolaro, Walter
Operation Experience with the LHC ACS RF System
title Operation Experience with the LHC ACS RF System
title_full Operation Experience with the LHC ACS RF System
title_fullStr Operation Experience with the LHC ACS RF System
title_full_unstemmed Operation Experience with the LHC ACS RF System
title_short Operation Experience with the LHC ACS RF System
title_sort operation experience with the lhc acs rf system
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-SRF2019-THP031
http://cds.cern.ch/record/2712616
work_keys_str_mv AT turajkatarzyna operationexperiencewiththelhcacsrfsystem
AT arnaudonluca operationexperiencewiththelhcacsrfsystem
AT baudrenghienphilippe operationexperiencewiththelhcacsrfsystem
AT brunnerolivier operationexperiencewiththelhcacsrfsystem
AT butterworthandrew operationexperiencewiththelhcacsrfsystem
AT gerigkfrank operationexperiencewiththelhcacsrfsystem
AT karppinenmikko operationexperiencewiththelhcacsrfsystem
AT maesenpierre operationexperiencewiththelhcacsrfsystem
AT montesinoseric operationexperiencewiththelhcacsrfsystem
AT peaugerfranck operationexperiencewiththelhcacsrfsystem
AT rosazguillaume operationexperiencewiththelhcacsrfsystem
AT shaposhnikovaelena operationexperiencewiththelhcacsrfsystem
AT smekensdavid operationexperiencewiththelhcacsrfsystem
AT taborellimauro operationexperiencewiththelhcacsrfsystem
AT therassemathieu operationexperiencewiththelhcacsrfsystem
AT timkohelga operationexperiencewiththelhcacsrfsystem
AT valuchdaniel operationexperiencewiththelhcacsrfsystem
AT valverdealonsonuria operationexperiencewiththelhcacsrfsystem
AT venturinidelsolarowalter operationexperiencewiththelhcacsrfsystem