Cargando…
Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of acusto m test bench for t...
Autores principales: | , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.370.0080 http://cds.cern.ch/record/2725203 |
_version_ | 1780966023007043584 |
---|---|
author | Irshad, Aamir Aspell, Paul Ramirez Garcia, Luis Felipe Hayat, Mohsin De Lentdecker, Gilles Licciulli, Francesco Mastrapasqua, Paola Petrow, Henri Robert, Frederic Tuuva, Tuure De Robertis, Giuseppe |
author_facet | Irshad, Aamir Aspell, Paul Ramirez Garcia, Luis Felipe Hayat, Mohsin De Lentdecker, Gilles Licciulli, Francesco Mastrapasqua, Paola Petrow, Henri Robert, Frederic Tuuva, Tuure De Robertis, Giuseppe |
author_sort | Irshad, Aamir |
collection | CERN |
description | The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of acusto m test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statisti cal data analysis. The paper details the firmware and software functions to achieve the test time per hybrid to 2 minutes. The test system produced an overall 89% production yield including the wafer dicing and hybrid assembly losses. |
id | oai-inspirehep.net-1792936 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2020 |
publisher | SISSA |
record_format | invenio |
spelling | oai-inspirehep.net-17929362020-07-28T21:17:22Zdoi:10.22323/1.370.0080http://cds.cern.ch/record/2725203engIrshad, AamirAspell, PaulRamirez Garcia, Luis FelipeHayat, MohsinDe Lentdecker, GillesLicciulli, FrancescoMastrapasqua, PaolaPetrow, HenriRobert, FredericTuuva, TuureDe Robertis, GiuseppeProduction and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 UpgradeDetectors and Experimental TechniquesThe CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of acusto m test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statisti cal data analysis. The paper details the firmware and software functions to achieve the test time per hybrid to 2 minutes. The test system produced an overall 89% production yield including the wafer dicing and hybrid assembly losses.SISSAoai:inspirehep.net:17929362020 |
spellingShingle | Detectors and Experimental Techniques Irshad, Aamir Aspell, Paul Ramirez Garcia, Luis Felipe Hayat, Mohsin De Lentdecker, Gilles Licciulli, Francesco Mastrapasqua, Paola Petrow, Henri Robert, Frederic Tuuva, Tuure De Robertis, Giuseppe Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_full | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_fullStr | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_full_unstemmed | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_short | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_sort | production and quality control of vfat3 front-end hybrids for the cms ge1/1 upgrade |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.22323/1.370.0080 http://cds.cern.ch/record/2725203 |
work_keys_str_mv | AT irshadaamir productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT aspellpaul productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT ramirezgarcialuisfelipe productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT hayatmohsin productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT delentdeckergilles productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT licciullifrancesco productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT mastrapasquapaola productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT petrowhenri productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT robertfrederic productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT tuuvatuure productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade AT derobertisgiuseppe productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade |