Cargando…
Assembly and qualification procedures of 2S modules and high rate tests of the CMS Binary Chip for the Phase 2 Upgrade of the CMS Outer Tracker
In the scope of this thesis several assembly steps and qualification procedures of 2S modules were developed. Several test stations were developed, programmed and commissioned to guarantee a high assembly quality. This includes test stations that verify the functionality of the sensors and final mod...
Autor principal: | Maier, Stefan |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2725964 |
Ejemplares similares
-
Prototyping and qualification of 2S modules for the CMS Outer Tracker upgrade at the HL-LHC
por: Zhang, F., et al.
Publicado: (2021) -
The Phase-2 upgrade of the CMS Outer Tracker
por: Lipinski, Martin
Publicado: (2021) -
The Phase-2 Upgrade of the CMS Outer Tracker
por: Nash, Kevin Connor
Publicado: (2021) -
The Phase-2 Upgrade of the CMS Outer Tracker
por: Roy Chowdhury, Suvankar
Publicado: (2020) -
The Phase-2 Upgrade of the CMS Outer Tracker
por: Marton, Krisztina
Publicado: (2023)