Cargando…
Cryogenic operational experience from the LHC physics run2 (2015 – 2018 inclusive)
With end of year 2018 the LHC has completed its second physics run and started its second two-years long shut down period dedicated to planned consolidation, maintenance and upgrade activities. The run2 – four-year physics operation period started in spring 2015 – was used mainly for luminosity prod...
Autores principales: | Brodzinski, K, Bradu, B, Delprat, L, Ferlin, G |
---|---|
Lenguaje: | eng |
Publicado: |
IOP
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/755/1/012096 http://cds.cern.ch/record/2725612 |
Ejemplares similares
-
Main improvements of LHC Cryogenics Operation during Run 2 (2015-2018)
por: Delprat, L, et al.
Publicado: (2017) -
Cryogenic management of the LHC run 2 dynamic heat loads
por: Bradu, B, et al.
Publicado: (2020) -
Cryogenics Experience with High Luminosity Running & Feedforward Controls
por: Ferlin, G, et al.
Publicado: (2019) -
LHC cryogenics – Run2 (2015) summary and perspectives
por: Brodzinski, K, et al.
Publicado: (2016) -
Adaptation of the Cryogenic System Capacity for the LHC Dynamic Heat Load - Operational Experience
por: Brodzinski, Krzysztof, et al.
Publicado: (2018)