Cargando…

Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN

The demand for liquid helium (LHe) for users at CERN without dedicated cryogenic infrastructure is set to increase due to future projects and experiments in the Antiproton Decelerator. LHe is supplied to the users by means of 500 liter dewars filled by the central liquefier (B165) that comprises a c...

Descripción completa

Detalles Bibliográficos
Autores principales: Pirotte, O, Lees, A, Barbe, T, Dupont, T, Pezzetti, M
Lenguaje:eng
Publicado: IOP 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1757-899X/755/1/012146
http://cds.cern.ch/record/2725900
_version_ 1780966152436973568
author Pirotte, O
Lees, A
Barbe, T
Dupont, T
Pezzetti, M
author_facet Pirotte, O
Lees, A
Barbe, T
Dupont, T
Pezzetti, M
author_sort Pirotte, O
collection CERN
description The demand for liquid helium (LHe) for users at CERN without dedicated cryogenic infrastructure is set to increase due to future projects and experiments in the Antiproton Decelerator. LHe is supplied to the users by means of 500 liter dewars filled by the central liquefier (B165) that comprises a cryogenic plant of 400 W @ 4.5 K. In addition, the Superconducting Cable & Wire Test Facility (B163) located nearby will be upgraded to incorporate the forthcoming installation of the new test station FRESCA 2. B163 includes a second cryogenic plant of 400 W @ 4.5 K and a dedicated cryogenic distribution system. To maximize the production of the two cryogenic plants and their ancillary infrastructure, thus improving the subsequent distribution of LHe, a combined cryogenic distribution system has been developed. This system will increase the LHe storage capacity; allow the direct transfer of helium inventory between both facilities and the gravity filling of large capacity trailer dewars in addition to the 500 liter dewar fleet. This paper details the architecture of the new cryogenic distribution system, the analysis undertaken to define it, the design and specifications of the various components and the schedule of the realization of the project.
id oai-inspirehep.net-1808233
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
publisher IOP
record_format invenio
spelling oai-inspirehep.net-18082332020-08-04T21:50:45Zdoi:10.1088/1757-899X/755/1/012146http://cds.cern.ch/record/2725900engPirotte, OLees, ABarbe, TDupont, TPezzetti, MCryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERNAccelerators and Storage RingsDetectors and Experimental TechniquesThe demand for liquid helium (LHe) for users at CERN without dedicated cryogenic infrastructure is set to increase due to future projects and experiments in the Antiproton Decelerator. LHe is supplied to the users by means of 500 liter dewars filled by the central liquefier (B165) that comprises a cryogenic plant of 400 W @ 4.5 K. In addition, the Superconducting Cable & Wire Test Facility (B163) located nearby will be upgraded to incorporate the forthcoming installation of the new test station FRESCA 2. B163 includes a second cryogenic plant of 400 W @ 4.5 K and a dedicated cryogenic distribution system. To maximize the production of the two cryogenic plants and their ancillary infrastructure, thus improving the subsequent distribution of LHe, a combined cryogenic distribution system has been developed. This system will increase the LHe storage capacity; allow the direct transfer of helium inventory between both facilities and the gravity filling of large capacity trailer dewars in addition to the 500 liter dewar fleet. This paper details the architecture of the new cryogenic distribution system, the analysis undertaken to define it, the design and specifications of the various components and the schedule of the realization of the project.IOPoai:inspirehep.net:18082332020
spellingShingle Accelerators and Storage Rings
Detectors and Experimental Techniques
Pirotte, O
Lees, A
Barbe, T
Dupont, T
Pezzetti, M
Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title_full Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title_fullStr Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title_full_unstemmed Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title_short Cryogenic Upgrade of the Helium Central Liquefier and Superconducting Cable & Wire Test Facilities at CERN
title_sort cryogenic upgrade of the helium central liquefier and superconducting cable & wire test facilities at cern
topic Accelerators and Storage Rings
Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1757-899X/755/1/012146
http://cds.cern.ch/record/2725900
work_keys_str_mv AT pirotteo cryogenicupgradeoftheheliumcentralliquefierandsuperconductingcablewiretestfacilitiesatcern
AT leesa cryogenicupgradeoftheheliumcentralliquefierandsuperconductingcablewiretestfacilitiesatcern
AT barbet cryogenicupgradeoftheheliumcentralliquefierandsuperconductingcablewiretestfacilitiesatcern
AT dupontt cryogenicupgradeoftheheliumcentralliquefierandsuperconductingcablewiretestfacilitiesatcern
AT pezzettim cryogenicupgradeoftheheliumcentralliquefierandsuperconductingcablewiretestfacilitiesatcern