Cargando…

Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC

The first prototype of the short orbit corrector for the upgrade of the LHC has been fabricated at CIEMAT, in collaboration with CERN, in the framework of the HL-LHC project. It consists of two nested dipoles, with an aperture of 150 mm and physical length of 1.5 m. A first power test was performed...

Descripción completa

Detalles Bibliográficos
Autores principales: García-Matos, Jesús A, Calero, Jesús, Domínguez, Manuel Ángel, Fernández, Alejandro, Gómez, Pablo, García-Tabarés, Luis, López, Daniel, Martínez, Luis Miguel, Martínez, Teresa, Munilla, Javier, Pardo, Jose A, Pérez, Jose M, Sobrino, Pablo, Toral, Fernando, Bajko, Marta, Emami, Sohrab, Fiscarelli, Lucio, Guinchard, Michael, Bermúdez, Susana Izquierdo, Mangiarotti, Franco J, Perez, Juan C, Todesco, Ezio, Willering, Gerard
Lenguaje:eng
Publicado: 2020
Acceso en línea:https://dx.doi.org/10.1109/TASC.2020.2971945
http://cds.cern.ch/record/2744538
_version_ 1780968702158569472
author García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel Ángel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
López, Daniel
Martínez, Luis Miguel
Martínez, Teresa
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Emami, Sohrab
Fiscarelli, Lucio
Guinchard, Michael
Bermúdez, Susana Izquierdo
Mangiarotti, Franco J
Perez, Juan C
Todesco, Ezio
Willering, Gerard
author_facet García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel Ángel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
López, Daniel
Martínez, Luis Miguel
Martínez, Teresa
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Emami, Sohrab
Fiscarelli, Lucio
Guinchard, Michael
Bermúdez, Susana Izquierdo
Mangiarotti, Franco J
Perez, Juan C
Todesco, Ezio
Willering, Gerard
author_sort García-Matos, Jesús A
collection CERN
description The first prototype of the short orbit corrector for the upgrade of the LHC has been fabricated at CIEMAT, in collaboration with CERN, in the framework of the HL-LHC project. It consists of two nested dipoles, with an aperture of 150 mm and physical length of 1.5 m. A first power test was performed without the outer dipole coils, which were replaced by a support structure to align the iron yoke with the collared inner dipole. This test was aimed to validate the coil fabrication techniques, which are innovative for a NbTi Rutherford cable. In the power test of the full assembled magnet, individual training of both dipoles was fine to ultimate current. However, the magnet was not able to reach nominal torque in combined operation. Several power tests and re-assemblies were necessary to be able to power both dipoles till nominal current. This paper describes the test results and analysis of the measurements. The magnet is heavily instrumented with voltage taps, collars with strain gauges and bullet gauges at the axial pushers.
id oai-inspirehep.net-1825889
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18258892022-08-17T12:59:35Zdoi:10.1109/TASC.2020.2971945http://cds.cern.ch/record/2744538engGarcía-Matos, Jesús ACalero, JesúsDomínguez, Manuel ÁngelFernández, AlejandroGómez, PabloGarcía-Tabarés, LuisLópez, DanielMartínez, Luis MiguelMartínez, TeresaMunilla, JavierPardo, Jose APérez, Jose MSobrino, PabloToral, FernandoBajko, MartaEmami, SohrabFiscarelli, LucioGuinchard, MichaelBermúdez, Susana IzquierdoMangiarotti, Franco JPerez, Juan CTodesco, EzioWillering, GerardPower Tests of the First Nested Orbit Corrector Prototype for HL-LHCThe first prototype of the short orbit corrector for the upgrade of the LHC has been fabricated at CIEMAT, in collaboration with CERN, in the framework of the HL-LHC project. It consists of two nested dipoles, with an aperture of 150 mm and physical length of 1.5 m. A first power test was performed without the outer dipole coils, which were replaced by a support structure to align the iron yoke with the collared inner dipole. This test was aimed to validate the coil fabrication techniques, which are innovative for a NbTi Rutherford cable. In the power test of the full assembled magnet, individual training of both dipoles was fine to ultimate current. However, the magnet was not able to reach nominal torque in combined operation. Several power tests and re-assemblies were necessary to be able to power both dipoles till nominal current. This paper describes the test results and analysis of the measurements. The magnet is heavily instrumented with voltage taps, collars with strain gauges and bullet gauges at the axial pushers.oai:inspirehep.net:18258892020
spellingShingle García-Matos, Jesús A
Calero, Jesús
Domínguez, Manuel Ángel
Fernández, Alejandro
Gómez, Pablo
García-Tabarés, Luis
López, Daniel
Martínez, Luis Miguel
Martínez, Teresa
Munilla, Javier
Pardo, Jose A
Pérez, Jose M
Sobrino, Pablo
Toral, Fernando
Bajko, Marta
Emami, Sohrab
Fiscarelli, Lucio
Guinchard, Michael
Bermúdez, Susana Izquierdo
Mangiarotti, Franco J
Perez, Juan C
Todesco, Ezio
Willering, Gerard
Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title_full Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title_fullStr Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title_full_unstemmed Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title_short Power Tests of the First Nested Orbit Corrector Prototype for HL-LHC
title_sort power tests of the first nested orbit corrector prototype for hl-lhc
url https://dx.doi.org/10.1109/TASC.2020.2971945
http://cds.cern.ch/record/2744538
work_keys_str_mv AT garciamatosjesusa powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT calerojesus powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT dominguezmanuelangel powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT fernandezalejandro powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT gomezpablo powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT garciatabaresluis powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT lopezdaniel powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT martinezluismiguel powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT martinezteresa powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT munillajavier powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT pardojosea powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT perezjosem powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT sobrinopablo powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT toralfernando powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT bajkomarta powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT emamisohrab powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT fiscarellilucio powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT guinchardmichael powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT bermudezsusanaizquierdo powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT mangiarottifrancoj powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT perezjuanc powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT todescoezio powertestsofthefirstnestedorbitcorrectorprototypeforhllhc
AT willeringgerard powertestsofthefirstnestedorbitcorrectorprototypeforhllhc