Cargando…

Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet

In 2018, FRESCA2 magnet, developed within a collaboration between CEA and CERN to provide a background field for tests of cables and small coils, reached a field of 14.6 T. This represents a new record field for dipole magnets with a clear aperture. As a continuity of the European project EUCARD-2,...

Descripción completa

Detalles Bibliográficos
Autores principales: Martins Araujo, Douglas, Kirby, Glyn, Van Nugteren, Jeroen, Murtomaki, Jaakko, Ferracin, Paolo, de Rijk, Gijs, Perez, Juan, Willering, Gerard, Canale, Matthieu
Lenguaje:eng
Publicado: 2020
Acceso en línea:https://dx.doi.org/10.1109/TASC.2020.2979393
http://cds.cern.ch/record/2744310
_version_ 1780968703227068416
author Martins Araujo, Douglas
Kirby, Glyn
Van Nugteren, Jeroen
Murtomaki, Jaakko
Ferracin, Paolo
de Rijk, Gijs
Perez, Juan
Willering, Gerard
Canale, Matthieu
author_facet Martins Araujo, Douglas
Kirby, Glyn
Van Nugteren, Jeroen
Murtomaki, Jaakko
Ferracin, Paolo
de Rijk, Gijs
Perez, Juan
Willering, Gerard
Canale, Matthieu
author_sort Martins Araujo, Douglas
collection CERN
description In 2018, FRESCA2 magnet, developed within a collaboration between CEA and CERN to provide a background field for tests of cables and small coils, reached a field of 14.6 T. This represents a new record field for dipole magnets with a clear aperture. As a continuity of the European project EUCARD-2, CERN aims at exploring accelerator magnet technology up to a 20 T operating field level. For that aim, Feather magnet 2, coils 3 and 4 (FM2.3-4) utilizing REBCO Roebel cable is planned to be inserted in FRESCA2 to reach a higher field. A new structure must be designed to accommodate the insert coils inside FRESCA2. The integrated design has to be capable to deal with several challenges. The magnetic forces in the coils of the insert magnet are high. FRESCA2 is pre-loaded by the so-called bladder-and-key concept, and a shrinking Al-alloy shell. The preload, however, decreases the diameter of the aperture at cryogenic temperature. The stiff external tube of FM2.3-4 is specifically designed for the background field operation. This component, made of 3D printed Inconel-based alloy, has a different thermal contraction with respect to the inner pole of FRESCA2. As a result, the thickness of the shell of FM2.3-4 needs to be maximized to guarantee mechanical support for the FM2.3-4, while simultaneously enabling the integration with FRESCA2.
id oai-inspirehep.net-1825894
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18258942020-11-19T17:12:36Zdoi:10.1109/TASC.2020.2979393http://cds.cern.ch/record/2744310engMartins Araujo, DouglasKirby, GlynVan Nugteren, JeroenMurtomaki, JaakkoFerracin, Paolode Rijk, GijsPerez, JuanWillering, GerardCanale, MatthieuPreliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole MagnetIn 2018, FRESCA2 magnet, developed within a collaboration between CEA and CERN to provide a background field for tests of cables and small coils, reached a field of 14.6 T. This represents a new record field for dipole magnets with a clear aperture. As a continuity of the European project EUCARD-2, CERN aims at exploring accelerator magnet technology up to a 20 T operating field level. For that aim, Feather magnet 2, coils 3 and 4 (FM2.3-4) utilizing REBCO Roebel cable is planned to be inserted in FRESCA2 to reach a higher field. A new structure must be designed to accommodate the insert coils inside FRESCA2. The integrated design has to be capable to deal with several challenges. The magnetic forces in the coils of the insert magnet are high. FRESCA2 is pre-loaded by the so-called bladder-and-key concept, and a shrinking Al-alloy shell. The preload, however, decreases the diameter of the aperture at cryogenic temperature. The stiff external tube of FM2.3-4 is specifically designed for the background field operation. This component, made of 3D printed Inconel-based alloy, has a different thermal contraction with respect to the inner pole of FRESCA2. As a result, the thickness of the shell of FM2.3-4 needs to be maximized to guarantee mechanical support for the FM2.3-4, while simultaneously enabling the integration with FRESCA2.oai:inspirehep.net:18258942020
spellingShingle Martins Araujo, Douglas
Kirby, Glyn
Van Nugteren, Jeroen
Murtomaki, Jaakko
Ferracin, Paolo
de Rijk, Gijs
Perez, Juan
Willering, Gerard
Canale, Matthieu
Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title_full Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title_fullStr Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title_full_unstemmed Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title_short Preliminary Integration for Testing HTS Feather-M2 in the FRESCA2 Dipole Magnet
title_sort preliminary integration for testing hts feather-m2 in the fresca2 dipole magnet
url https://dx.doi.org/10.1109/TASC.2020.2979393
http://cds.cern.ch/record/2744310
work_keys_str_mv AT martinsaraujodouglas preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT kirbyglyn preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT vannugterenjeroen preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT murtomakijaakko preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT ferracinpaolo preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT derijkgijs preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT perezjuan preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT willeringgerard preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet
AT canalematthieu preliminaryintegrationfortestinghtsfeatherm2inthefresca2dipolemagnet