Cargando…
Examination and Assessment of Large Forged Structural Components for the Precompression Structure of the ITER Central Solenoid
Large structural forgings of complex shape are required for several components of the precompression structure of the ITER Central Solenoid, consisting of a stack of six electrically independent modules and featuring a total height of 18 m and a diameter of over 4 m. The precompression structure all...
Autores principales: | Sgobba, Stefano, Aviles Santillana, Ignacio, Izquierdo, Gonzalo Arnau, Libeyre, Paul, Reagan, Travis, Hughes, Duke |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2020.2974679 http://cds.cern.ch/record/2743772 |
Ejemplares similares
-
Investigation of Materials and Welds for the Precompression Structure of the ITER Central Solenoid
por: Sgobba, Stefano, et al.
Publicado: (2018) -
Metallurgical assessment of large size tensioning components for the precompression structure of the ITER central solenoid
por: Sgobba, Stefano, et al.
Publicado: (2021) -
Physical Properties of a High-Strength Austenitic Stainless Steel for the Precompression Structure of the ITER Central Solenoid
por: Sgobba, Stefano, et al.
Publicado: (2016) -
Examination of ITER Central Solenoid prototype joints
por: Aviles Santillana, I, et al.
Publicado: (2019) -
Manufacture of the ITER Central Solenoid Components
por: Libeyre, Paul, et al.
Publicado: (2018)