Cargando…
Accelerator Schedule Management at CERN
Maximizing the efficiency of operating CERN’s accelerator complex requires careful forward planning, and synchronized scheduling of cross-accelerator events. These schedules are of interest to many people helping them to plan and organize their work. Therefore, this data should be easily accessible,...
Autores principales: | Urbaniec, Bartlomiej, Roderick, Chris |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA149 http://cds.cern.ch/record/2772239 |
Ejemplares similares
-
CERN Controls Configuration Service - a challenge in usability
por: Burdzanowski, Lukasz, et al.
Publicado: (2018) -
Accelerator fault tracking at CERN
por: Roderick, Chris, et al.
Publicado: (2018) -
NXCALS - Architecture and Challenges of the Next CERN Accelerator Logging Service
por: Wozniak, Jakub, et al.
Publicado: (2020) -
A rule-based consultant for accelerator beam scheduling used in the CERN PS complex
por: Lewis, J, et al.
Publicado: (1995) -
A rule-based consultant for accelerator beam scheduling used in the CERN PS complex
por: Lewis, J, et al.
Publicado: (1995)