Cargando…
Evaluation of an SFP Based Test Loop for a Future Upgrade of the Optical Transmission for CERN’s Beam Interlock System
The Beam Interlock System (BIS) is the backbone of CERN’s machine protection system. The BIS is responsible for relaying the so-called Beam Permit signal, initiating in case of need the controlled removal of the beam by the LHC Beam Dumping System. The Beam Permit is encoded as a specific frequency...
Autores principales: | Secondo, Raffaello, Galilée, Marc-Antoine, Garnier, Jean-Christophe, Martin, Christophe, Romera, Iván, Siemko, Andrzej, Uythoven, Jan |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-WEPHA131 http://cds.cern.ch/record/2766869 |
Ejemplares similares
-
The Consolidation of the CERN Beam Interlock System
por: Johnson, Roland, et al.
Publicado: (2021) -
Interlock System Upgrades at the CERN Accelerator Complex During Long Shutdown 2
por: Uythoven, Jan, et al.
Publicado: (2021) -
Fibre Monitoring System for the Beam Permit Loops at the LHC and Future Evolution of the Beam Interlock System
por: García-Argos, Carlos, et al.
Publicado: (2015) -
CERN Beam Interlock Redundant Dump Trigger Module Performance during LHC Run 2
por: Calcoen, Daniel, et al.
Publicado: (2016) -
The CERN Beam Interlock System: Principle and Operational Experience
por: Puccio, B, et al.
Publicado: (2010)