Cargando…

Preparing CERN Tier-0 data centres for LHC Run 3

Since 2013 CERN’s local data centre combined with a colocation infrastructure at the Wigner data centre in Budapest [1] have been hosting the compute and storage capacity for Worldwide LHC Computing Grid (WLCG) [2] Tier-0. In this paper we will describe how we try to optimize and improve the operati...

Descripción completa

Detalles Bibliográficos
Autor principal: Bärring, Olof
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1051/epjconf/202024507057
http://cds.cern.ch/record/2753511
_version_ 1780969442152284160
author Bärring, Olof
author_facet Bärring, Olof
author_sort Bärring, Olof
collection CERN
description Since 2013 CERN’s local data centre combined with a colocation infrastructure at the Wigner data centre in Budapest [1] have been hosting the compute and storage capacity for Worldwide LHC Computing Grid (WLCG) [2] Tier-0. In this paper we will describe how we try to optimize and improve the operation of our local data centre to meet the anticipated increment of the physics compute and storage requirements for Run 3, taking into account two important changes on the way: the end of the co-location contract with Wigner in 2019 and the loan of 2 out of 6 prefabricated compute modules being commissioned by the LHCb experiment [3] for their online computing farm.
id oai-inspirehep.net-1832111
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18321112021-03-04T20:31:41Zdoi:10.1051/epjconf/202024507057http://cds.cern.ch/record/2753511engBärring, OlofPreparing CERN Tier-0 data centres for LHC Run 3Computing and ComputersSince 2013 CERN’s local data centre combined with a colocation infrastructure at the Wigner data centre in Budapest [1] have been hosting the compute and storage capacity for Worldwide LHC Computing Grid (WLCG) [2] Tier-0. In this paper we will describe how we try to optimize and improve the operation of our local data centre to meet the anticipated increment of the physics compute and storage requirements for Run 3, taking into account two important changes on the way: the end of the co-location contract with Wigner in 2019 and the loan of 2 out of 6 prefabricated compute modules being commissioned by the LHCb experiment [3] for their online computing farm.oai:inspirehep.net:18321112020
spellingShingle Computing and Computers
Bärring, Olof
Preparing CERN Tier-0 data centres for LHC Run 3
title Preparing CERN Tier-0 data centres for LHC Run 3
title_full Preparing CERN Tier-0 data centres for LHC Run 3
title_fullStr Preparing CERN Tier-0 data centres for LHC Run 3
title_full_unstemmed Preparing CERN Tier-0 data centres for LHC Run 3
title_short Preparing CERN Tier-0 data centres for LHC Run 3
title_sort preparing cern tier-0 data centres for lhc run 3
topic Computing and Computers
url https://dx.doi.org/10.1051/epjconf/202024507057
http://cds.cern.ch/record/2753511
work_keys_str_mv AT barringolof preparingcerntier0datacentresforlhcrun3