Status of the installation and commissioning of the first GEM station at the CMS experiment

The foreseen upgrade of the Large Hadron Collider (LHC) will lead to an increase of its luminosity up to 5 – 7 × 1034 cm−2s−1, five times more than the original design value. The CMS muon system must be able to sustain a physics program after the increase of luminosity and maintain sensitivity for e...

Descripción completa

Detalles Bibliográficos
Autores principales: Fallavollita, F, Group, on behalf of the CMS Muon
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1742-6596/1690/1/012038
http://cds.cern.ch/record/2750788
_version_ 1780969226803085312
author Fallavollita, F
Group, on behalf of the CMS Muon
author_facet Fallavollita, F
Group, on behalf of the CMS Muon
author_sort Fallavollita, F
collection CERN
description The foreseen upgrade of the Large Hadron Collider (LHC) will lead to an increase of its luminosity up to 5 – 7 × 1034 cm−2s−1, five times more than the original design value. The CMS muon system must be able to sustain a physics program after the increase of luminosity and maintain sensitivity for electroweak physics for TeV scale searches achieved during Run2. To cope with the corresponding increase in background rates and trigger requirements, the installation of additional sets of muon detectors based on Gas Electron Multiplier (GEM) technology, referred to as GE1/1, GE2/1 and ME0, has been planned. The installation and commissioning of the GE1/1 detectors in the CMS experiment have been scheduled in two separate phases: the first 72 detectors have been already installed together with their services (gas, cooling, low voltage and high voltage) in 2019 and they are undergoing the commissioning phase, while the completion of the station is foreseen in autumn 2020. The author will describe the detector design, the quality assurance and certification path, as well as will present the status of the installation and commissioning, worth its preliminary results and an overview for the complete integration of the GE1/1 project on the CMS experiment.
id oai-inspirehep.net-1838575
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling oai-inspirehep.net-18385752021-02-09T10:07:43Zdoi:10.1088/1742-6596/1690/1/012038http://cds.cern.ch/record/2750788engFallavollita, FGroup, on behalf of the CMS MuonStatus of the installation and commissioning of the first GEM station at the CMS experimentDetectors and Experimental TechniquesParticle Physics - ExperimentThe foreseen upgrade of the Large Hadron Collider (LHC) will lead to an increase of its luminosity up to 5 – 7 × 1034 cm−2s−1, five times more than the original design value. The CMS muon system must be able to sustain a physics program after the increase of luminosity and maintain sensitivity for electroweak physics for TeV scale searches achieved during Run2. To cope with the corresponding increase in background rates and trigger requirements, the installation of additional sets of muon detectors based on Gas Electron Multiplier (GEM) technology, referred to as GE1/1, GE2/1 and ME0, has been planned. The installation and commissioning of the GE1/1 detectors in the CMS experiment have been scheduled in two separate phases: the first 72 detectors have been already installed together with their services (gas, cooling, low voltage and high voltage) in 2019 and they are undergoing the commissioning phase, while the completion of the station is foreseen in autumn 2020. The author will describe the detector design, the quality assurance and certification path, as well as will present the status of the installation and commissioning, worth its preliminary results and an overview for the complete integration of the GE1/1 project on the CMS experiment.oai:inspirehep.net:18385752020
spellingShingle Detectors and Experimental Techniques
Particle Physics - Experiment
Fallavollita, F
Group, on behalf of the CMS Muon
Status of the installation and commissioning of the first GEM station at the CMS experiment
title Status of the installation and commissioning of the first GEM station at the CMS experiment
title_full Status of the installation and commissioning of the first GEM station at the CMS experiment
title_fullStr Status of the installation and commissioning of the first GEM station at the CMS experiment
title_full_unstemmed Status of the installation and commissioning of the first GEM station at the CMS experiment
title_short Status of the installation and commissioning of the first GEM station at the CMS experiment
title_sort status of the installation and commissioning of the first gem station at the cms experiment
topic Detectors and Experimental Techniques
Particle Physics - Experiment
url https://dx.doi.org/10.1088/1742-6596/1690/1/012038
http://cds.cern.ch/record/2750788
work_keys_str_mv AT fallavollitaf statusoftheinstallationandcommissioningofthefirstgemstationatthecmsexperiment
AT grouponbehalfofthecmsmuon statusoftheinstallationandcommissioningofthefirstgemstationatthecmsexperiment