Cargando…
Upgrade of the NA61/SHINE Detector
The NA61/SHINENA61/SHINE detector is being upgraded during the Long Shutdown 2 period (2019–2021). In order to match the requirements for the upcoming open charm measurement program. The main goal of the upgradeUpgrade is to accelerate the readout rate by a factor of 10 and increase acceptance in th...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1007/978-3-030-53448-6_74 http://cds.cern.ch/record/2765823 |
Sumario: | The NA61/SHINENA61/SHINE detector is being upgraded during the Long Shutdown 2 period (2019–2021). In order to match the requirements for the upcoming open charm measurement program. The main goal of the upgradeUpgrade is to accelerate the readout rate by a factor of 10 and increase acceptance in the high density tracks environment. The following elements of the detector are parts Upgrade of the upgrade: Time Projection Chambers, Vertex Detector, Beam Position Detectors and Projectile Spectator Detector. Besides the detectors, a new Trigger and Data Acquisition system is being developed. |
---|