Cargando…

LHC and Injector Availability: Run 2

This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam du...

Descripción completa

Detalles Bibliográficos
Autores principales: Todd, B, Apollonio, A, Niemi, A, Ponce, L, Roderick, C, Walsh, D
Lenguaje:eng
Publicado: 2019
Acceso en línea:http://cds.cern.ch/record/2750275
_version_ 1780969122642788352
author Todd, B
Apollonio, A
Niemi, A
Ponce, L
Roderick, C
Walsh, D
author_facet Todd, B
Apollonio, A
Niemi, A
Ponce, L
Roderick, C
Walsh, D
author_sort Todd, B
collection CERN
description This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam dump causes, fill length, turnaround , a detailed breakdown of all faults and impacts, with notable faults and new root causes identified. The second section covers the injector complex. The final section introduces new concepts and approaches which are currently being considered for practical application in availability studies. This work has been produced and ratified by the Availability Working Group, which has compiled fault information for the period in question using the Accelerator Fault Tracker.
id oai-inspirehep.net-1842521
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling oai-inspirehep.net-18425212021-05-11T13:18:23Zhttp://cds.cern.ch/record/2750275engTodd, BApollonio, ANiemi, APonce, LRoderick, CWalsh, DLHC and Injector Availability: Run 2This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam dump causes, fill length, turnaround , a detailed breakdown of all faults and impacts, with notable faults and new root causes identified. The second section covers the injector complex. The final section introduces new concepts and approaches which are currently being considered for practical application in availability studies. This work has been produced and ratified by the Availability Working Group, which has compiled fault information for the period in question using the Accelerator Fault Tracker.oai:inspirehep.net:18425212019
spellingShingle Todd, B
Apollonio, A
Niemi, A
Ponce, L
Roderick, C
Walsh, D
LHC and Injector Availability: Run 2
title LHC and Injector Availability: Run 2
title_full LHC and Injector Availability: Run 2
title_fullStr LHC and Injector Availability: Run 2
title_full_unstemmed LHC and Injector Availability: Run 2
title_short LHC and Injector Availability: Run 2
title_sort lhc and injector availability: run 2
url http://cds.cern.ch/record/2750275
work_keys_str_mv AT toddb lhcandinjectoravailabilityrun2
AT apollonioa lhcandinjectoravailabilityrun2
AT niemia lhcandinjectoravailabilityrun2
AT poncel lhcandinjectoravailabilityrun2
AT roderickc lhcandinjectoravailabilityrun2
AT walshd lhcandinjectoravailabilityrun2