LHC and Injector Availability: Run 2
This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam du...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750275 |
_version_ | 1780969122642788352 |
---|---|
author | Todd, B Apollonio, A Niemi, A Ponce, L Roderick, C Walsh, D |
author_facet | Todd, B Apollonio, A Niemi, A Ponce, L Roderick, C Walsh, D |
author_sort | Todd, B |
collection | CERN |
description | This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam dump causes, fill length, turnaround , a detailed breakdown of all faults and impacts, with notable faults and new root causes identified. The second section covers the injector complex. The final section introduces new concepts and approaches which are currently being considered for practical application in availability studies. This work has been produced and ratified by the Availability Working Group, which has compiled fault information for the period in question using the Accelerator Fault Tracker. |
id | oai-inspirehep.net-1842521 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-18425212021-05-11T13:18:23Zhttp://cds.cern.ch/record/2750275engTodd, BApollonio, ANiemi, APonce, LRoderick, CWalsh, DLHC and Injector Availability: Run 2This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam dump causes, fill length, turnaround , a detailed breakdown of all faults and impacts, with notable faults and new root causes identified. The second section covers the injector complex. The final section introduces new concepts and approaches which are currently being considered for practical application in availability studies. This work has been produced and ratified by the Availability Working Group, which has compiled fault information for the period in question using the Accelerator Fault Tracker.oai:inspirehep.net:18425212019 |
spellingShingle | Todd, B Apollonio, A Niemi, A Ponce, L Roderick, C Walsh, D LHC and Injector Availability: Run 2 |
title | LHC and Injector Availability: Run 2 |
title_full | LHC and Injector Availability: Run 2 |
title_fullStr | LHC and Injector Availability: Run 2 |
title_full_unstemmed | LHC and Injector Availability: Run 2 |
title_short | LHC and Injector Availability: Run 2 |
title_sort | lhc and injector availability: run 2 |
url | http://cds.cern.ch/record/2750275 |
work_keys_str_mv | AT toddb lhcandinjectoravailabilityrun2 AT apollonioa lhcandinjectoravailabilityrun2 AT niemia lhcandinjectoravailabilityrun2 AT poncel lhcandinjectoravailabilityrun2 AT roderickc lhcandinjectoravailabilityrun2 AT walshd lhcandinjectoravailabilityrun2 |