Cargando…
LHC and Injector Availability: Run 2
This paper summarises machine availability of the LHC and injector complex, starting with an evaluation of the machine performance in 2018, working backwards to then appraise the whole of Run 2. The first section of this paper considers LHC; identifying operational aspects, beam mode ratios, beam du...
Autores principales: | Todd, B, Apollonio, A, Niemi, A, Ponce, L, Roderick, C, Walsh, D |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750275 |
Ejemplares similares
-
CERN Injector Complex Availability 2018
por: Niemi, Arto, et al.
Publicado: (2019) -
LHC availability 2017: Proton physics-setting the scence
por: Todd, B, et al.
Publicado: (2019) -
Availability projections for the CERN injector complex following the LHC Injectors Upgrade
por: Apollonio, Andrea
Publicado: (2020) -
Availability projections for the CERN injector complex following the LHC Injectors Upgrade
por: Apollonio, Andrea
Publicado: (2020) -
LHC Availability 2018: Proton Physics
por: Todd, Benjamin, et al.
Publicado: (2018)