Cargando…
Controls and the AFT Tool
This paper summarises accelerator Controls and the Accelerator Fault Tracking (AFT) tool for LHC during Run 2. Concerning Controls, the performance and evolution will be covered, with a particular focus on the so-called "Smooth Upgrades" process. Subsequently, the major changes linked with...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750281 |
_version_ | 1780969124171612160 |
---|---|
author | Roderick, C Baggiolini, V Deghaye, S Gourber-Pace, M Hatziangeli, E Eynden, M Vanden |
author_facet | Roderick, C Baggiolini, V Deghaye, S Gourber-Pace, M Hatziangeli, E Eynden, M Vanden |
author_sort | Roderick, C |
collection | CERN |
description | This paper summarises accelerator Controls and the Accelerator Fault Tracking
(AFT) tool for LHC during Run 2. Concerning Controls, the performance and
evolution will be covered, with a particular focus on the so-called "Smooth
Upgrades" process. Subsequently, the major changes linked with Long Shutdown 2
(LS2) will be described, including End-Of-Life, changes to the GUI strategy, and
the introduction of the new Logging system-NXCALS. Finally, re-commissioning
considerations and the outlook for Run 3 will be covered. The AFT tool will be
described in terms of what value it brought during Run 2, and in what direction
it should, or could evolve going forwards. |
id | oai-inspirehep.net-1842528 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-18425282021-05-11T13:18:24Zhttp://cds.cern.ch/record/2750281engRoderick, CBaggiolini, VDeghaye, SGourber-Pace, MHatziangeli, EEynden, M VandenControls and the AFT ToolThis paper summarises accelerator Controls and the Accelerator Fault Tracking (AFT) tool for LHC during Run 2. Concerning Controls, the performance and evolution will be covered, with a particular focus on the so-called "Smooth Upgrades" process. Subsequently, the major changes linked with Long Shutdown 2 (LS2) will be described, including End-Of-Life, changes to the GUI strategy, and the introduction of the new Logging system-NXCALS. Finally, re-commissioning considerations and the outlook for Run 3 will be covered. The AFT tool will be described in terms of what value it brought during Run 2, and in what direction it should, or could evolve going forwards.oai:inspirehep.net:18425282019 |
spellingShingle | Roderick, C Baggiolini, V Deghaye, S Gourber-Pace, M Hatziangeli, E Eynden, M Vanden Controls and the AFT Tool |
title | Controls and the AFT Tool |
title_full | Controls and the AFT Tool |
title_fullStr | Controls and the AFT Tool |
title_full_unstemmed | Controls and the AFT Tool |
title_short | Controls and the AFT Tool |
title_sort | controls and the aft tool |
url | http://cds.cern.ch/record/2750281 |
work_keys_str_mv | AT roderickc controlsandtheafttool AT baggioliniv controlsandtheafttool AT deghayes controlsandtheafttool AT gourberpacem controlsandtheafttool AT hatziangelie controlsandtheafttool AT eyndenmvanden controlsandtheafttool |