Cargando…
RF System Availability and Performance during Run 2
The Run 2 operation and availability for the LHC RF system are presented, including year-to-year performance comparisons. In addition, the evolution of the present RF system is discussed, with improvements in diagnostics, operation, and software being highlighted. Lessons learned from the Run 2 RF p...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Acceso en línea: | http://cds.cern.ch/record/2750282 |
_version_ | 1780969124389715968 |
---|---|
author | Turaj, K Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Gerigk, F Montesinos, E Shaposhnikova, E Timko, H Valuch, D |
author_facet | Turaj, K Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Gerigk, F Montesinos, E Shaposhnikova, E Timko, H Valuch, D |
author_sort | Turaj, K |
collection | CERN |
description | The Run 2 operation and availability for the LHC RF system are presented,
including year-to-year performance comparisons. In addition, the evolution of
the present RF system is discussed, with improvements in diagnostics, operation,
and software being highlighted. Lessons learned from the Run 2 RF performance
are reviewed, with a focus both on limitations that were addressed during Run 2
and limitations that may have implications for Run 3 and beyond. Finally, an
overview of operational parameters, spares management, and long-term
developments is presented. |
id | oai-inspirehep.net-1842529 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | oai-inspirehep.net-18425292021-05-11T13:18:24Zhttp://cds.cern.ch/record/2750282engTuraj, KArnaudon, LBaudrenghien, PBrunner, OButterworth, AGerigk, FMontesinos, EShaposhnikova, ETimko, HValuch, DRF System Availability and Performance during Run 2The Run 2 operation and availability for the LHC RF system are presented, including year-to-year performance comparisons. In addition, the evolution of the present RF system is discussed, with improvements in diagnostics, operation, and software being highlighted. Lessons learned from the Run 2 RF performance are reviewed, with a focus both on limitations that were addressed during Run 2 and limitations that may have implications for Run 3 and beyond. Finally, an overview of operational parameters, spares management, and long-term developments is presented.oai:inspirehep.net:18425292019 |
spellingShingle | Turaj, K Arnaudon, L Baudrenghien, P Brunner, O Butterworth, A Gerigk, F Montesinos, E Shaposhnikova, E Timko, H Valuch, D RF System Availability and Performance during Run 2 |
title | RF System Availability and Performance during Run 2 |
title_full | RF System Availability and Performance during Run 2 |
title_fullStr | RF System Availability and Performance during Run 2 |
title_full_unstemmed | RF System Availability and Performance during Run 2 |
title_short | RF System Availability and Performance during Run 2 |
title_sort | rf system availability and performance during run 2 |
url | http://cds.cern.ch/record/2750282 |
work_keys_str_mv | AT turajk rfsystemavailabilityandperformanceduringrun2 AT arnaudonl rfsystemavailabilityandperformanceduringrun2 AT baudrenghienp rfsystemavailabilityandperformanceduringrun2 AT brunnero rfsystemavailabilityandperformanceduringrun2 AT butterwortha rfsystemavailabilityandperformanceduringrun2 AT gerigkf rfsystemavailabilityandperformanceduringrun2 AT montesinose rfsystemavailabilityandperformanceduringrun2 AT shaposhnikovae rfsystemavailabilityandperformanceduringrun2 AT timkoh rfsystemavailabilityandperformanceduringrun2 AT valuchd rfsystemavailabilityandperformanceduringrun2 |